PA600CM Ceiling Mount for NP-PA653U, NP-PA803U, NP-PA853W, NP-PA903X, NP-P506QL, NP-PA653UL, NP-PA703UL, NP-P474WL, NP-P474UL, NP-P554WL, NP-P554UL, NP-PA803UL, NP-PE455WL, NP-PE455UL, NP-P525WL, NP-P525UL, NP-P605UL, NP-P547UL, and NP-P627UL Projectors 50 lb (22.7 kg) Compatible AEC*, model/series* EXT* 2015-06-17 #:056-9083-5 (2021-07-09)
Page 2
WARNING ENG - This product is designed to be installed on wood joist/beam or solid concrete ceilings. Hardware is included for wood joist/beam and solid concrete installation. Before installing make sure the supporting surface will support the combined load of the equipment and hardware. Screws must be tightly secured. Do not overtighten screws or damage can occur and product may fail.
Page 3
Tools Needed for Assembly. ENG To properly tighten screws: Tighten until screw head makes contact, then tighten another 1/2 turn. Do not overtighten screws. 3/8" (10mm) +1/2 5/32" 5/16" (4mm) (8mm) 2015-06-17 #:056-9083-5 (2021-07-09)
Page 4
Parts (Before beginning, make sure you have all parts shown below). Parts List Description Part # A projector mount assembly 055-KPRGU-W-5 B connection block 580-4065 C 4mm security allen wrench 560-9646 D concrete anchor 590-0320 E #14 x 2.5 phillips hex head wood screw 5S1-015-C04 F #10-32 x 3/8"...
Page 5
Wood joist/beam Extension Column (not included) Concrete Ceiling 1b-1 WARNING ENG - When installing Peerless ceiling mounts on a wood joist/beam covered with gypsum board (drywall), verify that the joists or beams are a minimum of 2" x 4" nominal size. Do not install over gypsum board thicker than 5/8". 1a-1 Use stud finder to locate and mark stud center lines.
Page 6
1a-3 5/32" 2.5" (4mm) (64mm) Mounting hole must center on stud. Drill mounting holes into supporting surface 5/32" (2.5" (64mm) minimum depth required). (4mm) 1a-4 Install using wood screws provided. ACCESS SLOT FOR ACCESS SLOT FOR WOOD JOIST WOOD JOIST OPEN END WRENCH OPEN END WRENCH ALLOWS TIGHTENING...
Page 7
1b-1 Loosen. 1b-2 Rotate mount at least three full turns onto EXT or AEC series extension column (sold separately). 1b-3 Tighten. 2015-06-17 #:056-9083-5 (2021-07-09)
Page 8
WARNING ENG - When installing Peerless ceiling mounts on a concrete ceiling, the ceiling must be at least 8" thick with a minimum compressive strength of 2000 psi. Never attach concrete expansion anchors to concrete covered with plaster, drywall, or other finishing material. 1c-1 Mark mounting holes.
Page 9
1c-3 Insert anchor flush to concrete. D (2) 2b-4 1c-4 Install using concrete anchors and wood screws provided. Maximum 80 in. ∙ lb (9 N.M.). H (2) E (2) 2015-06-17 #:056-9083-5 (2021-07-09)
Page 10
* For use with * For use with NP-PA653UL, NP-PA703UL, NP-PA653U, NP-PA803U, NP-PA803UL, NP-PE455WL, NP-PA853W, NP-PA903X, NP-PE455UL, NP-P525WL, and NP-P506QL only NP-P525UL, and NP-P605UL only 2a-1 2b-1 2015-06-17 #:056-9083-5 (2021-07-09)
Page 11
This page intentionally left blank. 2015-06-17 #:056-9083-5 (2021-07-09)
Page 12
2a-1 Note proper orientation of notch. F (2) 2a-2 K (4) L (4) 2015-06-17 #:056-9083-5 (2021-07-09)
Page 13
2b-1 Note proper orientation of notch. F (2) 2b-2 K (4) K (4) L (4) L (4) NP-PA653UL, NP-PA703UL, NP-PE455WL, and NP-PA803UL only NP-PE455UL, NP-P525WL, NP-P525UL, and NP-P605UL only 2015-06-17 #:056-9083-5 (2021-07-09)
Page 18
This page intentionally left blank. 2015-06-17 #:056-9083-5 (2021-07-09)
Page 19
This page intentionally left blank. 2015-06-17 #:056-9083-5 (2021-07-09)
Page 20
Warranty Garantía Garantie Garantie Garantie ČEŠ Záruka Garantia TÜR Garanti̇ Garanzia Záruka www.peerless-av.com/warranty Peerless-AV Peerless-AV Europe Peerless-AV América Latina 2300 White Oak Circle Unit 3 Watford Interchange, Av. de las Industrias 413 Aurora, IL 60502 Colonial Way, Watford, Herts, Parque Industrial Escobedo Email: tech@peerlessmounts.com WD24 4WP, United Kingdom General Escobedo N.L., México 66062...