When checking the P.C.B.s:
•
Spread the rubber sheet and the cloth. Then place this unit on the cloth and check it. (Fig. 3)
•
Reconnect all cables (connectors) that have been disconnected.
•
When connecting the flexible flat cable, be careful with polarity.
•
Connect the 3 ground points (G1, G2, G3) of the POWER (1) P.C.B. to the chassis with a ground lead or the like. (Fig. 3)
Top cover ass'y
Front panel unit
MAIN (1) P.C.B.
Ground lead
Fig. 3
CRX-330/NS-BP100
G3
POWER (1) P.C.B.
G2
Chassis
Loader mechanism unit
Rubber sheet and cloth
Ground lead
G1
15