Complete The Planning Worksheet On The Poster - HP AD510A - StorageWorks Modular Smart Array 1500 cs 2U Fibre Channel SAN Attach Controller Shelf Hard Drive Installation Manual

Modular smart array
Hide thumbs Also See for AD510A - StorageWorks Modular Smart Array 1500 cs 2U Fibre Channel SAN Attach Controller Shelf Hard Drive:
Table of Contents

Advertisement

Installation Procedures - All Deployments

Complete the planning worksheet on the poster

The printed configuration overview poster, included in the shipping carton, is a
companion to this installation guide, and should be completed before installing
your MSA.
Use the poster to:
In addition to the poster, see and record system information in the
"Worksheets" on page 107.
Information in these worksheets is required for multi-pathing, future
configuration changes, and troubleshooting purposes.
Note:
worksheets.
20
Gather all of the components necessary for installing your MSA
Verify that the components you plan to use are supported for use with the
MSA and your operating system environment
Record important information about the components that you plan to use
Learn about this installation process
If a supplier is installing the MSA for you, be sure that they complete these
HP StorageWorks 1500 Modular Smart Array Installation Guide

Advertisement

Table of Contents
loading

Table of Contents