Epson ActionTower 3000 Computer User Manual page 66

Epson actiontower 3000 computer user manual
Hide thumbs Also See for ActionTower 3000 Computer:
Table of Contents

Advertisement

4. Position one of the cache chips over the first socket as shown
below, aligning the pins on the chip with the holes in the
socket. Make sure the small notch on the end of the chip is
aligned with the corresponding notch on the socket.
5. Gently press the chip halfway into the socket (to make sure
it is correctly aligned). If the chip goes in at an angle,
remove it and try again.
6. When the chip is properly positioned, push down firmly on
both ends to make sure it is well-seated.
7. Repeat steps 4 through 6 for each of the remaining chips.
8. Change jumpers J23, J24, J25, and J26, as described on
page 3-8, to match to the amount of cache you installed.
9. Replace any option cards you removed. See page 3-15.
10. Run SETUP to enable the
check that the
options are
Cache and
Memory
Advanced System Setup menu. Make sure you save your
settings as you leave SETUP. (See Chapter 1.)
External Cache
System shadow
enabled. You select these options from the
Memory Shadowoptions
Installing and Removing Options
option and
and
Video shadow
on the
3-23

Advertisement

Table of Contents
loading

Table of Contents