Toshiba RELIABILITY IN MOTION 1000 Series User Manual page 28

Single phase 1000 va to 3000 va uos
Hide thumbs Also See for RELIABILITY IN MOTION 1000 Series:
Table of Contents

Advertisement

Planning a UPS system should include the following considerations:
The total demand of the protected system shall dictate the output power rating (VA).
Allow a margin for future expansion or calculation inaccuracies from measuring
power requirements.
Backup time needed will determine the battery size needed. If the load is less than
the UPS nominal power rating then the actual backup time will be longer.
The following options are available:
External Battery Cabinets, and
Connectivity options (Remote Contact, SNMP/WEB card).
The following UPS models are available.
Backup time Internal
Model
UPS 1000VA
UPS 1500VA
UPS 2000VA
UPS 3000VA
Additional External Battery Cabinets are available if more back-up time is needed.
Recharge time to 90%
batteries
7 min
6 min
7 min
6 min
5
capacity
4 hours
4 hours
4 hours
4 hours

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents