Planning a UPS system should include the following considerations:
•
The total demand of the protected system shall dictate the output power rating (VA).
Allow a margin for future expansion or calculation inaccuracies from measuring
power requirements.
•
Backup time needed will determine the battery size needed. If the load is less than
the UPS nominal power rating then the actual backup time will be longer.
•
The following options are available:
•
External Battery Cabinets, and
•
Connectivity options (Remote Contact, SNMP/WEB card).
The following UPS models are available.
Backup time Internal
Model
UPS 1000VA
UPS 1500VA
UPS 2000VA
UPS 3000VA
Additional External Battery Cabinets are available if more back-up time is needed.
Recharge time to 90%
batteries
7 min
6 min
7 min
6 min
5
capacity
4 hours
4 hours
4 hours
4 hours