Toshiba RELIABILITY IN MOTION 1000 Series User Manual page 36

Single phase 1000 va to 3000 va uos
Hide thumbs Also See for RELIABILITY IN MOTION 1000 Series:
Table of Contents

Advertisement

Settings
7) OUTLET
GROUP1/GROUP2
SETTING
Option 1: 1 On /2 On
Option 2: 1 Off /2 On
Option 3: 1 Off /2 Off
Option 4: 1 On /2 Off
8)BATTERY TEST
TEST?
9) SILENCE SET
ON/OFF
10)BAT CABINET
0: EXT B. PACKS
SET
1: EXT B. PACKS
2: EXT B. PACKS
11) SITE FAULT
ENABLE/DISABLE
SET
12) LANGUAGE
ENGLISH
GERMAN
FRENCH
SPANISH
ITALIAN
13) GENERATOR
ON/OFF
14) RS232
ENABLE/CHANGE
CONTROL
Complete the installation entirely before changing the default settings or connecting a load to the
UPS.
Options
Default
Option 1
OFF
0
DISABLE
ENGLISH
OFF
ENABLE
13
Remarks
This is a load-shed feature.
Perform battery test
immediately
Shown options when battery
Cabinets are connected
Alarm on main computer
connected at wrong polarity
or
Installation to main supply
without group.
If ON, UPS will work with a
very large range of voltages
and frequencies, without
switching back and forth
from Line battery mode.
Option to enable and disable
the RS232 port. USB share
the communication line with
RS232. Only one option may
be used at a time.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents