To Start The Engine; Connecting Electrical Loads; Stopping The Engine - Craftsman 580.323602 Owner's Manual

Ac generator 3600 watt
Table of Contents

Advertisement

Available languages

Available languages

To Start The Engine
CAUTION
See "Don't Ovedoad Generator".
Start generator and let engine stabilize before connecting
electrical loads.
Connect electrical loads in OFF position, then turn ON
for operation.
Turn electrical loads OFF and disconnect from generator
before stopping generator.
Disconnect
all electrical
loads from the generator.
Follow start instruction
steps in numerical
order:
1.
Make sure unit is on a level surface.
IMPORTANT:
Failure
to start and operate
unit on a
level surface
will cause the unit not to start or shut
down during
operation.
2.
Turn fuel valve to "On" position.
Fuel valve handle
should
be vertical
(pointing
toward
ground)
for fuel
to flow.
Fuel Valve is shown
in the On position
3.
Place choke lever in "Choke" position.
/
4.
Set rocker switch to "On" position.
Rocker Switch is
shown in On position
5.
Grasp recoil handle and pull slowly until slight
resistance is felt. Then pull rapidly to start engine.
WARNING
When
starting
engine,
pull cord
slowly
until resistance
is
felt and then
pull rapidly
to avoid kickback.
NEVER
start or stop engine
with electrical
devices
plugged
in and turned
on,
iMPORTANT:
if engine floods, place choke lever in
"Run" position and crank until engine starts.
1
6.
Move choke lever to "Run" position a short
distance at a time over several seconds in warm
weather or minutes in cold weather. Let engine
run smoothly before each change. Operate with
choke in"Run" position.
NOTE: If engine starts after 3 pulls but fails to run, or
if unit shuts down during operation, make sure unit is
on a level surface and check for proper oil level in
crankcase. This unit may be equipped with a low oil
)rotection device.
WARNING
DO NOT touch
hot surfaces,
Allow
equipment
to coo! before
touching.
The generator
must be at bast 5 feet from structures
having
combustible
wails and/or other combustible
materials.
Keep at least 3 feet of clearance
on al! sides
of generator
for adequate
cooling,
maintenance
and servicing.
In the State
of California
a spark arrester
is required
by
law (Section
4442
of the California
Public
Resources
Code),
Other
states
may have similar
laws. Federal
laws
apply on federal
lands.
If you equip the muffler
with a
spark arrester,
it must be maintained
in effective
working
order,You
can order
a spark arrester
through
your
authorized
Sears
service
dealer,
Connecting
E_ectrica_ Loads
Let the engine stabilize and warm up for a few
minutes after starting.
DO NOT connect 240 Volt loads to 120 Volt
receptacles.
DO NOT connect 3-phase
loads to the generator.
DO NOT connect 50 Hz loads to the generator.
Plug in and turn on the desired 120 Volt AC, single
phase, 60 Hertz electrical loads.
DO NOT OVERLOAD THE GENERATOR.
See
"Don't Overload Generator".
Stopping
the Engine
1.
Turn off and unplug all electrical loads from unit.
NEVER start or stop engine with electrical devices
plugged in and turned on.
2.
Let engine run at no-load for two minutes to
stabilize unit's internal temperatures.
3.
Move rocker switch to "Off" position.
4.
Move fuel valve to "Off" position.
l
CAUTION
DO
NOT
stop engine by moving choke lever to "Choke"
position, Backfire,fireor engine damage
could occur,

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents