Craftsman ZTS 7500 Operator's Manual page 8

2-bin bagger 107.24906
Hide thumbs Also See for ZTS 7500:
Table of Contents

Advertisement

Available languages

Available languages

A. Notches in Bag support
B. Rubber Loop Strap
C. Bracket in Upper Tube
Assembly
D. Support
E. Upper Tube
F. Middle Tube
G. Pin
H. Rubber Strap
I.
Lower Tube
Figure 9. Upper Tube Assembly installation (Hopper Top Not Shown for Clarity)
Figure 10. Upper Tube to Bag Support installation
A. Notches in Bag support
B. Rubber Loop Strap
C. Bracket
in Upper Tube
D. Support
E. Upper Tube Assembly
F. Middle Tube
Tube Installation
1. Set middle tube (F, Figures 9 & 10) and upper tube
(E) into bag support (D) so that bracket (C) rests in
support (D). Pull rubber loop strap (B) over upper
tube and secure into notch (A).
2. Slide middle tube assembly (E, Figure 9) onto lower
tube (F).
3. Slide middle tube (F) over lower tube (I). Pull rubber
strap (H) and place hole completely over pin (G).
Figure 11. Bag Installation
A. Bag Support
Hoops
B. Bag Hoops
C. Bag
D. White Bar
Bag
Installation
t. Install bag (C, Figure t t) with white bar (C) toward
the rear. Set bag hoops (B) on bag support hoops
(A) as shown.
Repeat for other side.
Closing
and Opening
the Hopper
t. To increase ease of opening and closing hopper
press latch located beneath center of hopper lid.
iMPORTANT:
Reconnect spark plug before attempting
to start ZT Rider.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

107.24906

Table of Contents