Pre-Installation Checklist - GE ZGU384LSMSS Installation Instructions Manual

30" stainless steel gas cooktops natural and lp gas model
Hide thumbs Also See for ZGU384LSMSS:
Table of Contents

Advertisement

Available languages

Available languages

PRE-INSTALLATION CHECKLIST

1. When preparing cooktop opening, make sure
the inside of the cabinet and the cooktop do
not interfere with each other. (See section on
preparing the opening.)
2. Slide the cooktop out of the end of the box.
Remove packaging materials, grate boxes,
regulator and literature package from the
cooktop before beginning installation.
• Use the shipping carton as a pad to protect
customer countertops or flooring.
Foam support
Packaging containing
left and right side grates
Regulator taped
to the underside
Packaging containing
left and right side grates
Installation Preparation
3. Remove Installation Instructions from literature
4. Make sure you have all the tools and materials
5. Your home must provide the adequate electrical
6. When installing your cooktop in your home, make
7. Make sure the wall coverings, countertop and
Foam packaging
6
package and read them carefully before you
begin.
Be sure to place all literature, Owner's Manual,
Installations, etc. in a safe place for future
reference.
you need before starting the installation of the
cooktop.
service needed to safely and properly use your
cooktop. (Refer to section on electrical
requirements.)
sure all local codes and ordinances are followed
exactly as stated.
cabinets around the cooktop can withstand heat
(up to 200°F) generated by the cooktop.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Monogram zgu384nMonogram zgu384lZgu384nsmss

Table of Contents