NEC N8800-164F User Manual page 42

Express5800/r320a-e4, express5800/r320b-m4
Table of Contents

Advertisement

3-14 Installing Server
Steps to Install the Rack-mount Model to the Tower Conversion Kit
Follow the procedure below to install the devices to the tower conversion kit.
1.
Open the front door of the tower conversion kit.
If the door is locked, use the server-accessory key to
unlock.
2.
Confirm the spots to fix 4 core nuts on the front
of the chassis.
See the figure on the right for where to fix the
core nuts
(2 on the front top and 2 on the front bottom.)
4 core nuts have been installed on the front of the
chassis.
3.
Remove one screw that fixes the AC lock bracket
on the rear of the tower conversion kit.
Tower conversion kit (on the front top)
Tower conversion kit (on the front bottom)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Exp320lN8800-165fExp320mNec express5800 series

Table of Contents