Item
front of the exhaust outlet.
Clearance Requirements from Vent Terminations to Building Openings
opening in any building:
any door, operable window, or gravity air inlet
into any building.
3' above any forced air inlet within 10'.
8
<When supplying combustion air from the indoors>
Illustration
There must be no
building opening
or more
within this area.
or more
or more or more
Illustration
1' *
3' *