Setup - AEG Protect PV User Manual

Solar inverters protect pv inverter series
Hide thumbs Also See for Protect PV:
Table of Contents

Advertisement

2. Display

2.1.5. Setup

Menu Structure - Setup
Display Functions
2
[-] External Alarm
[-] Setup details
[-] Inverter details
[-] Calibration
[-] PV array
[-] Communication setup
[-] RS485 setup
[-] IP Setup
Table 2.7: Setup
*) Not available.
10
Stop Alarm
Test Alarm
Alarm time-out: 009 s
Alarm state: Disabled
Language: English
Inverter name:
AEG PS
*
Group name:
Group name
*
[-] Master mode
Master mode: Enabled
*
[-] Network
*
[-] Initiate network scan
[-] Scan progress: 0%
[-] Inverters found: 0
Plant name:
*
Plant name
*
[-] Set date and time
Date: dd.mm.yyyy (30.12.2002)
Time: hh.mm.ss (13.45.27)
PV input 1: 6000 W
PV 1 area: 123 m
2
PV input 2: 6000 W
2
PV 2 area: 123 m
PV input 3: 6000 W
PV 3 area: 123 m
2
[-] Irradiation sensor
2
Scale (mV/1000 W/m
): 75
Temp. coeff: 0.06 %/
o
C
[-] Temp. sensor offset
o
PV module temp: 2
C
Ambient Temp: 2
o
C
[-] S0 sensor input
Scale (pulses/kWh): 1000
[-] Environment
*
CO
emission factor:
2
*
0.5 kg/kWh
Remuneration per kWh:
*
44.42 ct/kWh
Yield start count: 1000 kWh
Network: 15
Subnet:15
Address: 255
IP config: Automatic
IP address:
192.168.1.191
Subnet mask:
255.255.255.0
Default gateway:
192.168.1.1
DNS server:
123.123.123.123
8000038784_00_BAL_en / L00410565-01_02
Description
Only applicable if external alarm is connected
Stop alarm
Includes testing red LED on front
Amount of time the alarm is active in seconds. If value is set to 0,
alarm time-out is disabled and the alarm will be active until the fail-
ure that has triggered the alarm is corrected or the alarm has been
stopped. See above.
The language in the display; changing the display language does
not affect country setting
The inverter's name. Max. 15 characters and not only numbers.
The name of the group the inverter is part of
Max. 15 characters
Only visible if Master mode is enabled.
The name of the plant.
Max. 15 characters
Set the current date
Set the current time
Only applicable if sensors are connected
Not visible if inverter only has 2 PV inputs
Not visible if inverter only has 2 PV inputs
Sensor calibration
Sensor calibration
Sensor calibration (offset)
Sensor calibration (offset)
Sensor calibration. See note
Value to be used for total CO
2
Value to be used for total revenue calculation
A value used as an offset from the current production value when
*
calculating the yield.
Only applicable if communication accessories are connected
saved calculation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents