12 Service Position
12.1. Checking & Repair AC Inlet
P.C.B
· Follow the (Step 1) - (Step 2) of Item 10.3.
12.2. Checking & Repair FL P.C.B
and Power BTN P.C.B.
· Follow the (Step 1) - (Step 2) of Item 10.3.
· Follow the (Step 1) - (Step 4) of Item 10.4.
· Follow the (Step 1) - (Step 3) of Item 10.11.
Step 1 Connect FFC at connector (CN6900).
12.3. Checking & Repair Main
P.C.B., Power P.C.B, Regulator
P.C.B.
· Follow the (Step 1) - (Step 2) of Item 10.3.
· Follow the (Step 1) - (Step 4) of Item 10.4.
· Follow the (Step 1) - (Step 4) of Item 10.6.
· Follow the (Step 1) - (Step 3) of Item 10.11.
· Follow the (Step 1), (Step 3) of Item 10.7.
Step 1 Connect FFC at connector (CN6900).
Step 2 Turn over main P.C.B. to position on CR16D
Mechanism unit horizontally.
12.4. Checking & Repair DVD
Module P.C.B.
· Follow the (Step 1) - (Step 2) of Item 10.3.
· Follow the (Step 1) - (Step 4) of Item 10.4.
· Follow the (Step 1) - (Step 4) of Item 10.6.
· Follow the (Step 1) - (Step 3) of Item 10.11.
· Follow the (Step 1) of Item 10.5.
Step 1 Connect FFC at connector (CN6900).
Step 2 Put the CR16D Mechanism Unit up position and
checking or repair the DVD Module P.C.B.
47
SA-HT680PL