HP LH 3r Installation Manual page 12

Compaq 4000/7000 racks
Hide thumbs Also See for LH 3r:
Table of Contents

Advertisement

Chapter 3
22nd
20th
(At Rear
Of Column)
Figure 3-1. Marking Holes for Installation
You will mark two holes on each of the front columns to use for the rack nuts where
the two recessed mounting brackets attach to the columns. When the installation is
complete, these brackets secure the NetServer in the rack enclosure.
To mark the bracket mounting holes (refer to Figure 3-1):
1. On the left front column, count up from the top of the unit below, marking
the 14th and 19th holes.
2. On the right front column, count up from the top of the unit below,
marking the 11th and 15th holes.
8
22nd
20th
19th
14th
Installation
22nd
20th
15th
11th
22nd
20th

Advertisement

Table of Contents
loading

Table of Contents