Installing The Discharge Chute - Toro 38025—250000001 Operator's Manual

1800 power curve
Table of Contents

Advertisement

SQUEEZE
Figure 2
1. Upper tubing
3. Carefully insert the left side of the upper tubing into
the end of the lower left side tubing (Fig. 2).
4. Squeeze the upper tubes together, and wiggle the upper
tubes down until the mounting holes in the upper and
lower tubing line up (Fig. 2).
5. Place the mounting plate over the tubes (Fig. 3). Align
the mounting plate holes with the upper and lower
tubing holes.
2
4
Figure 3
1. Mounting plate
2. Shroud
6. Insert the end of the chute crank through the hole in
the shroud. Turn the chute crank rod lightly until the
flattened end drops into the slot in the gear. Firmly
push the chute crank into the gear until it snaps into
place (Figs. 3 and 4).
1
2
1531
2. Lower tubing
1
3
1532
3. Chute crank
4. Gear
2
1
Figure 4
1. Chute crank
7. Secure the upper and lower tubing and the mounting
plate together with 2 machine screws and locknuts.
Note: Position the screw heads on the outside of the
mounting plate. Be careful not to damage the internal
electrical wiring when you insert the screws. If the
wiring blocks the hole, use a blunt 1/8-in. punch to
carefully route the electrical wiring away from the aligned
holes.

Installing the Discharge Chute

1. Position the chute deflector onto the discharge chute
and align the mounting holes (Fig. 5).
1
4
3
Figure 5
1. Chute deflector
2. Discharge chute
3. Rubber washer (2)
2. Insert 2 rubber washers between the chute deflector
and the discharge chute while maintaining the hole
alignment (Fig. 5).
5
1533
2. Chute crank gear
5
6
2
1534
4. Carriage bolt (2)
5. Metal washer (2)
6. Locknut (2)

Advertisement

Table of Contents
loading

This manual is also suitable for:

1800 power curve38025

Table of Contents