Fujitsu PRIMERGY CX122 S1 Operating Manual

Hide thumbs Also See for PRIMERGY CX122 S1:

Advertisement

Quick Links

Operating Manual - English
PRIMERGY CX122 S1
Server
Operating Manual
Edition November 2010

Advertisement

Table of Contents
loading

Summary of Contents for Fujitsu PRIMERGY CX122 S1

  • Page 1 Operating Manual - English PRIMERGY CX122 S1 Server Operating Manual Edition November 2010...
  • Page 2: Copyright And Trademarks

    All hardware and software names used are trademarks of their respective manufacturers. – The contents of this manual may be revised without prior notice. – Fujitsu assumes no liability for damages to third party copyrights or other rights arising from the use of any information in this manual.
  • Page 3 Before reading this manual For your safety This manual contains important information for safely and correctly using this product. Carefully read the manual before using this product. Pay particular attention to the accompanying manual "Safety Notes and Regulations" and ensure these safety notes are understood before using the product.
  • Page 4 (hereafter, "high safety use"). Customers should not use this product for high safety use unless measures are in place for ensuring the level of safety demanded of such use. Please consult the sales staff of Fujitsu if intending to use this product for high safety use.
  • Page 5: Table Of Contents

    4.2.2 Installing a PRIMERGY CX122 S1 server ... . 29 Connecting devices and cables ....32 4.3.1...
  • Page 6 LAN indicators ......39 Front panel ......41 5.2.1 Controls .
  • Page 7: Preface

    PRIMERGY CX1000 system units can be set up 'back to back' requiring less datacenter floor space. PRIMERGY CX122 S1 server nodes for use with the CX1000 rack infrastructure are all-purpose servers with top dual processor performance for cloud computing data centers.
  • Page 8: Documentation Overview

    Documentation overview Documentation overview More information on your PRIMERGY CX122 S1 can be found in the following documents: – "Quick Start Software - Quick Installation Guide" DVD booklet (only included with the ServerView Suite as a printed copy) except for the Japanese market –...
  • Page 9: Features

    Expansion Cards Each PRIMERGY CX122 S1 server node provides one riser slot (PCIe Gen2 x16 ). Hard Disk Drives The PRIMERGY CX122 S1 server node can be ordered with up to two 2.5-inch SATA hard disk drives. Operating Manual CX122 S1...
  • Page 10: Notational Conventions

    Notational conventions Serviceability and Support Operating and maintaining your PRIMERGY CX1000 S1 rack server system is easy: CX122 S1 server nodes are lightweight, mounted on slide rails with front accessible network ports. The highly efficient power supply connects cordlessly to the power distribution unit in the rack. The fanless node cooling concept allows for virtually wear-free operation.
  • Page 11: Technical Data

    Technical data Technical data Electrical data Rated voltage range 200 V - 240 V Rated frequency 50 Hz - 60 Hz Max. rated current 200 V - 240 V / 2.0 A Rated current X5500 series CPUs 200 V - 240 V / 1.8 A Rated current E5500 series CPUs 200 V - 240 V / 1.0 A Rated current L5500 series CPUs 200 V - 240 V / 0.8 A Rated current idle mode...
  • Page 12 Technical data Compliance with regulations and standards Product safety and ergonomics International IEC 60950-1/2 Europe EN 60950-1/2 EN 50371 USA / Canada UL/CSA 60950-1/2 Taiwan CNS 14336 USA / Canada GB 4943 Electromagnetic compatibility International AS / NZS CISPR22 Class A Europe CE Class A EN 55022...
  • Page 13 Technical data Ventilation clearance Front min. 200 mm Rear min. 200 mm Ambient conditions Environment class 3K2 DIN IEC 721 section 3-3 Environment class 2K2 DIN IEC 721 section 3-2 Ambient temperature 10°C - 35°C (DIN IEC 721-3-3) class 3K2, ETSI 300 019-2-3 Class 3.1 Temperature: Operation (3K2)
  • Page 14 Technical data Operating Manual CX122 S1...
  • Page 15: Installation Steps, Overview

    Ê First of all, it is essential that you familiarize yourself with the safety information in chapter "Important information" on page Ê Your PRIMERGY CX1000 system has been unpacked and set up by a Fujitsu service technician. Make sure that the accompanying documentation (see "Documentation overview" on page 8) is complete.
  • Page 16 Operating Manual CX122 S1...
  • Page 17: Important Information

    Important information In this chapter you will find essential information regarding safety when working on your server. Information for ensuring electromagnetic compatibility All data and signal cables must have sufficient shielding The LAN cabling must be conform with the requirements EN 50173 and EN 50174-1/2.
  • Page 18 For safety reasons, no more than one unit may be withdrawn from the rack at any one time during installation and maintenance work. Please keep in mind, that PRIMERGY CX122 S1 server nodes will tip over or fall out of the rack if slid out too far! The rack must be connected to the power supply by an authorized specialist (electrician).
  • Page 19 Safety instructions If necessary, have other people help you mount the individual components in the rack because of the weight involved. Install only system expansions that satisfy the requirements and rules governing safety. If you install other expansions, you may damage the system or violate these safety regulations.
  • Page 20 (electric shock, cooling, fire protection, interference suppression). When removing a PRIMERGY CX122 S1 server from the system unit, always install a dummy cover in the empty installation bay. Only install system expansions that satisfy the requirements and rules governing safety and electromagnetic compatibility and those relating to telecommunication terminals.
  • Page 21 Safety instructions Modules with Electrostatic-Sensitive Devices Modules with electrostatic-sensitive devices are identified by the following sticker: Figure 1: ESD label When you handle components fitted with ESDs, you must always observe the following points: Switch off the system and remove the power plugs from the power outlets before installing or removing components with ESDs.
  • Page 22: Ce Conformity

    Consult the dealer or an experienced radio/TV technician for help. Fujitsu Technology Solutions is not responsible for any radio or television interference caused by unauthorized modifications of this equipment or the substitution or attachment of connecting cables and equipment other...
  • Page 23: Environmental Protection

    Environmental protection Environmentally-friendly product design and development This product has been designed in accordance with the Fujitsu Technology Solutions standard for "environmentally friendly product design and development". This means that key factors such as durability, selection and labeling of materials, emissions, packaging, ease of dismantling and recycling have been taken into account.
  • Page 24 Details regarding the return and recycling of devices and consumables within Europe can also be found in the "Returning used devices" manual, via your local Fujitsu Technology Solutions branch or from our recycling center in Paderborn: Fujitsu Technology Solutions Recycling Center D-33106 Paderborn Tel.
  • Page 25: Hardware Installation

    Hardware installation CAUTION! Follow the safety instructions in the chapter "Important information" on page Do not expose the server to extreme environmental conditions (see "Ambient conditions" on page 13). Protect the server from dust, humidity and heat. Make sure that the server is acclimatized for the time indicated in this table before putting it into operation.
  • Page 26: Installation Procedure

    CAUTION! Observe the safety and installation notes in the chapter "Important information" on page Your PRIMERGY CX122 S1 server is being already assembled into the PRIMERGY CX1000 and ready to operate. Make sure that the accompanying documentation (see "Documentation overview" on page 8) is complete.
  • Page 27: Installing / Replacing A Primergy Cx122 S1 Server

    4.2.1 Removing a PRIMERGY CX122 S1 server A defective PRIMERGY CX122 S1 server is maintained by Fujitsu service technicians. The warranty is void if the server is damaged during installation or replacement of system expansions. Ê Shut down the server.
  • Page 28 Ê Carefully slide the server out of the rack (2). CAUTION! Please keep in mind, that PRIMERGY CX122 S1 server nodes will tip over or fall out of the rack if slid out too far! Ê Remove the defective server.
  • Page 29: Installing A Primergy Cx122 S1 Server

    Installing a PRIMERGY CX122 S1 server No additional mechanical parts such as support brackets or screws are required for the installation of a PRIMERGY CX122 S1 server in the CX1000 system unit. Figure 4: Mounting a server in the rack (A) Ê...
  • Page 30 Ê Insert the server into the rack at the desired installation position. Ê Slide the server in the direction of the arrow until it stops (1). The PRIMERGY CX122 S1 power supply unit will automatically be connected with the power distribution unit in the CX1000 system unit.
  • Page 31 Installing / replacing a PRIMERGY CX122 S1 server Figure 6: Mounting a server in the rack (C) Ê Reconnect all cables. For further information network cabling, please refer to section "Network cabling" on page Operating Manual CX122 S1...
  • Page 32: Connecting Devices And Cables

    Connecting devices and cables Connecting devices and cables CAUTION! You must use shielded cables for the LAN cabling. The connectors for external devices and network connections are on the front of the server. The standard connectors (figure 7) are marked with symbols, some are color-coded.
  • Page 33: Connecting Devices

    Connecting devices and cables 4.3.1 Connecting devices – Some of the devices connected require special software (e.g. drivers) (see documentation for the connected device). – If components with large power requirements (e.g. external USB hard disk drives) are connected simultaneously, these USB ports may be switched off.
  • Page 34: Network Cabling

    4 (LAN Card 2) grey 5 (LAN Card 3) black 6 (LAN Card 4) Table 2: LAN cabling color coding (switches) The color coded LAN cables are assigned to the PRIMERGY CX122 S1 network ports as follows: Operating Manual CX122 S1...
  • Page 35 Connecting devices and cables Figure 8: LAN cabling color coding (servers) Operating Manual CX122 S1...
  • Page 36 Connecting devices and cables Onboard server ports P1 and P2 to network switches 1 and 2 Connection Switch Server Port Label Port Label Switch 1 to Server 1 Port 5 SW1P5 Port 1 SV1P1 Switch 2 to Server 1 Port 5 SW2P5 Port 2 SV1P2...
  • Page 37 Connecting devices and cables LAN card server ports P5 and P6 to network switches 5 and 6 Connection Switch Server Port Label Port Label Switch 5 to Server 1 Port 5 SW5P5 Port 5 SV1P5 Switch 6 to Server 1 Port 5 SW6P5 Port 6...
  • Page 38 Connecting devices and cables Operating Manual CX122 S1...
  • Page 39: Starting Up And Operation

    Starting up and operation CAUTION! Follow the safety instructions in chapter "Important information" on page LAN indicators Figure 9: LAN indicators on the front connection panel Operating Manual CX122 S1...
  • Page 40 LAN indicators Service LAN (onboard) 1 LAN activity indicator 2 LAN transfer rate indicator green ON: Active connection OFF: 10 Mbit/s green FLASHING: green ON: 100 Mbit/s Transmit / Receive activity Gigabit LAN (onboard) 3 LAN activity indicator 4 LAN transfer rate indicator green ON: Active connection OFF: 10 Mbit/s green FLASHING:...
  • Page 41: Front Panel

    Front panel Front panel Figure 10: PRIMERGY CX122 S1 front panel 1 ID indicator / ID button 4 Hard disk drive activity indicator 2 CSS indicator 5 Power-on indicator / On/Off button (not supported by PRIMERGY 6 Reset button CX122 S1)
  • Page 42: Controls

    Front panel 5.2.1 Controls On/Off button When the system is switched off, it can be switched on again by pressing the On/Off button. When the system is operating, pressing the On/Off button will switch off the system. The On/Off button does not isolate the device from the mains voltage.
  • Page 43: Indicators

    You can find more details on the indicated errors in the System Event Log. CSS indicator (yellow) Not used. At present, the PRIMERGY CX122 S1 server does not comprise any CSS components. ID indicator (blue) The system has been selected by pressing the ID button. To deactivate, press the button again.
  • Page 44: Switching The Server On And Off

    41) lights up green. Starting up the server for the first time When starting up a PRIMERGY CX122 S1 server node for the first time, there are several installation options, depending on the system configuration. For further information, please refer to section "Configuring the server"...
  • Page 45: Switching The Server Off

    The PDF files of the manuals can also be downloaded free of charge from the Internet. The overview page showing the online documentation available on the Internet can be found using the URL (for EMEA market): http://manuals.ts.fujitsu.com. The PRIMERGY server documentation can be accessed using the Industry standard servers navigation option.
  • Page 46 Configuring the server When starting up a PRIMERGY CX122 S1 server node for the first time, there are several installation options, depending on the system configuration: – Hard disk drives installed - Preboot Execution Environment (PXE) boot (recommended) PXE boot requires your machine's BIOS to make a request of a TFTP server for a bootable image (the equivalent of inserting a CD and booting).
  • Page 47 Ê Press the On/Off button (item 5 in figure 10 on page 41). Your PRIMERGY CX122 S1 server node will boot from the local disk image. Ê Follow the on-screen instructions. – No hard disk drives installed - iSCSI boot iSCSI (Internet SCSI) is a protocol for linking servers and data storage facilities, similar to the Fibre Channel Protocol (FCP).
  • Page 48: Operating Manual Cx122 S1

    Configuring the server Operating Manual CX122 S1...
  • Page 49: Index

    Index acclimatization time FCC statement ambient conditions features CX122 S1 expansion cards hard disk drives high capacity CE marking 12, power supply Class A Compliance Statement system board configuration ventilation CX122 S1 connectors CX122 S1 Global Error indicator consumables CX122 S1 CSS indicator CX122 S1 hard disk activity indicator...
  • Page 50 Low Voltage Directive 12, power-on indicator Service LAN onboard meaning of the symbols startup mechanical values switching on/off CX122 S1 CX122 S1 system board network cabling target group network indicators technical data CX122 S1 Network switches NMI button ventilation clearances CX122 S1 CX122 S1 noise level...