The heat pump has been designed to supply enough heat to make up for the heat loss from the
building. If the heat pump is commissioned in the winter it may be found that the electric consumption
is high for the first few months. This would be due to the initial first start heat load and, on new builds,
the building being 'wet'.
Maintenance
Your heat pump will operate efficiently for many years with minimal attention. An annual check to
clean the heat exchanger from debris is all it will require.
Heating System Maintenance Advice
Please consult the heating system installers as to any recommended maintenance requirements.
Safety valves fitted to the hot water and central heating systems should be checked annually.
EcoDan Installation Manual Version 1.0 (26/01/09)
Ice Energy Heat Pumps Ltd © 2008
- 5 -