Installation Process (also see Mitsubishi Manual)
Finding a suitable position for the EcoDan
The unit must be bolted into place on a stable platform. The unit must also have free air flow as per
the diagram below.
EcoDan Installation Manual Version 1.0 (26/01/09)
Ice Energy Heat Pumps Ltd © 2008
- 9 -