Panasonic KX-T0155 Quick Installation Manual page 20

Dect 6.0 cell station unit
Hide thumbs Also See for KX-T0155:
Table of Contents

Advertisement

4 Before Site Survey
5.
Install the CS temporarily for the site survey. Install the CS at least 2 m (6 ft 7 in) above the floor, and place
the antennas so that they are pointing in directions that are 90 degrees apart (for antenna diversity), as
follows:
At least 2 m
(6 ft 7 in)
20
Quick Installation Guide
45º
90º
45º
Document Version 2009-12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kx-t0158Kx-tda0156

Table of Contents