Power Requirements; Ups Recommendations - Toshiba IPedge Installation Manual

Hide thumbs Also See for IPedge:
Table of Contents

Advertisement

POWER REQUIREMENTS

POWER REQUIREMENTS
UPS
RECOMMENDATIONS
Installation Manual
June, 2011
The IPedge server should have a dedicated AC power circuit. The
specific input voltage and current requirements for each server is listed
the specifications for each model.
Toshiba recommends an uninterruptible power supply (UPS) with power
conditioning for the IPedge server. The recommended UPS from ONEAC
are shown in
Table
2-3. The UPS shown in the table include power
conditionaing. If you already have a UPS in place Toshiba recommends
that you install the power conditioner listed in
Table 2-3 IPedge System Power Conditioner and UPS
Power Conditioner
30 Minutes
1 Hour
Battery
Backup
2 Hours
Time
4 Hours
8 Hours
Table
2-3.
IPedge Server
EC
PC180A-S2S
PC360A-S4S
ON700XAU-SN
ON700XAU-SN
ON700XAU-SN1
ON700XAU-SN1
ON700XAU-SN1
ON700XAU-SN1
ON700XAU-SN1
ON700XAU-SN2
ON700XAU-SN2
ON700XAU-SN4
EM Server Bezel
EM
2-13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents