Mitsubishi Electric Jet Towel JT-SB116JH-G-NA Installation Manual page 8

Hand dryer
Hide thumbs Also See for Jet Towel JT-SB116JH-G-NA:
Table of Contents

Advertisement

Installation (Continued)
3.For plaster or drywall construction,
position at least one side of the back panel
holes over the wooden studs for better
securement.
4.From the 7 possible hole locations on the
back panel, mark the 7 drill hole positions
on the wall and remove the back panel.
5.Drill the 7 holes and insert the 6 enclosed
self tapping screws (excluding the hole in
the lower right corner) through the back
panel and into the wooden studs. To secure
the opposite side of the back panel, use ¹
₄"(M6) Toggle Bolts (not included) due to the
heavy weight of the hand dryer. Do not use
3
plastic anchors as they may be insuffi cient
to support the weight.
6.For cement, brick or tile construction, use
#12 - 14 Anchors (not included).
7.Securely tighten the ¹₂"(16mm) connector
for grounding as shown in the drawing.
Run the power cable through the hole in the back
of the unit, and pull it through the unit.
4
Back panel
Power cable
− 8 −
11
11
(297)
"
Detailed view of
1 6
installation hole
11
2
"
16
(68)
Electrical Conduit/
Tubing
3
1
4
4
"
"
4
8
(120)
(104)
¹₂"(16mm)
Connector
Hole
Green striped
bonding wire
Power cable
Green striped
bonding wire
13
"
32
(10)
Back panel
in. (mm)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jet towel jt-sb116jh-w-na

Table of Contents