Procedure for Piston (Traction) Pump Flow Test
This test measures piston (traction) pump output (flow).
During this test, pump load is created at the flow meter
using the adjustable load valve on the tester.
IMPORTANT: Traction
Groundsmaster 4100/4110 is approximately 30 GPM
(113.5 LPM). Use 40 GPM Hydraulic Tester #AT40002
(pressure and flow) for this test (see Special Tools
in this chapter).
1. Make sure hydraulic oil is at normal operating tem-
perature by operating the machine under load for
approximately ten (10) minutes. Make sure the hydrau-
lic tank is full.
2. Park machine on a level surface with the cutting deck
raised and off. Latch wing decks in raised position. Make
sure that the Hi/Low switch is in the Low speed (4WD)
position. Shut off engine.
CAUTION
Prevent personal injury and/or damage to equip-
ment. Read all WARNINGS, CAUTIONS and Pre-
cautions for Hydraulic Testing at the beginning
of this section.
3. Make sure that traction pedal is adjusted to the neu-
tral position. Also, ensure that traction pump is at full
stroke when traction pedal is pushed into fully forward
position.
4. Raise and support machine so all wheels are off the
ground (see Jacking Instructions in Chapter 1 -- Safety).
5. Thoroughly clean junction of hydraulic hose and left
side fitting on bottom of traction pump (forward port)
(Fig. 36). Disconnect hose from left side pump fitting.
6. Install 40 GPM Hydraulic Tester #AT40002 (pres-
sure and flow) in series between traction pump fitting
and disconnected hose to allow flow from traction pump
to tester. Use hydraulic hose kit (see Special Tools in this
chapter) to connect tester to machine. Make sure that fit-
ting and hose connections are properly tightened. Also,
make sure the flow control valve on tester is fully open.
CAUTION
All wheels will be off the ground and rotating dur-
ing this test. Make sure machine is supported so
it will not move and accidentally fall to prevent in-
juring anyone near the machine.
Groundsmaster 4100--D/4110--D
circuit
flow
for
the
Page 4 - - 49
7. Start engine and run at idle speed. Check for any hy-
draulic leakage from tester and hose connections. Cor-
rect any leaks before proceeding.
8. Move throttle so engine is running at high idle speed
(2870 RPM).
9. Slowly push traction pedal to fully forward position.
Keep pedal fully depressed in the forward position.
10.Have second person carefully watch pressure gauge
on tester while slowly closing the flow control valve until
1000 PSI (69 bar) is obtained. Verify with a phototac that
the engine speed is still 2870 RPM.
NOTE: If engine speed drops below 2870 RPM, pump
flow will decrease.
11. Observe flow gauge. Flow indication should be
approximately 29 GPM (110 LPM).
12.Release traction pedal to the neutral position, open
flow control valve on tester and shut off engine. Record
test results.
13.If flow is less than 26 GPM (98 LPM), consider the
following:
A. The traction pump swash plate is not being ro-
tated fully (e.g. Hi/Low switch is not in Low speed
(4WD), traction pedal linkage may need adjust-
ment).
B. The hydrostat needs to be repaired or replaced
as necessary.
14.Make necessary repairs before performing any addi-
tional tests.
15.When testing is complete, disconnect tester and
hose kit from pump fitting and machine hydraulic hose.
Reconnect machine hydraulic hose to pump fitting. Low-
er machine to ground.
RIGHT
1
FRONT
Figure 36
1.
Piston (traction) pump
2
2. LH fitting (forward port)
Hydraulic System

Advertisement

Table of Contents
loading

This manual is also suitable for:

30449Groundsmaster 4110-d30447

Table of Contents