Download Print this page

Troubleshooting - Mitsubishi Electric GT10-LDR User Manual

Memory loader

Advertisement

9.2 To read out the data from the memory loader to a PC (GT
Designer2 Ver.2.77F or later, GT Designer3 Ver.1.01B or
later).
The project data and resource data are read out from the memory loader to a PC
(GT Designer2, GT Designer3). The operation procedure is described below.
Project data
Resource data
PC
Memory loader
(GT Designer2, GT Designer3)
1) Connect a PC (GT Designer2, GT Designer3) to the memory loader with USB
cable supplied.
2) Select the data to be uploaded in a PC (GT Designer2, GT Designer3) and read it
out from the memory loader.
Refer to the following manual for details about operating instructions of GT
Designer2 or GT Designer3.
GT Designer2 Version
Basic Operation/Data Transfer Manual
GT Designer3 Version
Screen Design Manual (Fundamentals)
10. To write the data from the Memory loader to the GOT
The standard monitor OS, communication driver, font data, and project data are
written from the memory loader to the GOT. The operation procedure is described
below.
10.1 When the Data selection switch is [PROJECT + OS]
Standard monitor OS
Communication driver
Font data
Project data
GT1020, GT1030
Memory loader
1) Connect the memory loader to the GOT.
2) Turn ON the GOT by pressing the lower right corner of the GOT.
(The GOT startups with OS installation screen.)
The OS can be transferred from GT Designer2 Version2 or GT Designer3
Version
without displaying the OS installation screen depending on the
combination of the GOT and the standard monitor OS.
Refer to the following manual for details about OS installation screen.
GT10 User's Manual
3) Set the Data selection switch to [PROJECT + OS] and the RD/WR selection
switch to [WR], and select the data to be transferred and transfer direction.
4) Press the ENT key to determine the data to be transferred and transfer direction.
(SET/RUN LED will be orange.)
*: If the next operation is not performed within 30 seconds after the ENT key is
pressed, SET/RUN LED will be unlit, and the operations that have been made will
be canceled.
*: When the Data selection switch or the RD/WR selection switch is operated,
after the data to be transferred and the transfer direction are determined, the
operations that have been made will be canceled.
5) Press the ENT key again to start the transfer. (SET/RUN LED will be green
flashing.)
6) Turn OFF the GOT and remove the memory loader after the transfer is
completed. (SET/RUN LED will be green flashing.)
Refer to the "Chapter 12 Troubleshooting" for details on handling errors during
transferring.
10.2 When the Data selection switch is [PROJECT]
Project data
GT1020, GT1030
Memory loader
1) Connect the memory loader to the GOT and turn ON the GOT.
2) Set the Data selection switch to [PROJECT] and the RD/WR selection switch to
[WR], and select the data to be transferred and transfer direction.
3) Press the ENT key to determine the data to be transferred and transfer direction.
(SET/RUN LED will be orange.)
*: If the next operation is not performed within 30 seconds after the ENT key is
pressed, SET/RUN LED will be unlit, and the operations that have been made will
be canceled.
*: When the Data selection switch or the RD/WR selection switch is operated,
after the data to be transferred and the transfer direction are determined, the
operations that have been made will be canceled.
4) Press the ENT key again to start the transfer. (SET/RUN LED will be green
flashing.)
5) Turn OFF the GOT and remove the memory loader after the transfer is
completed. (SET/RUN LED will be green flashing.)
Refer to the "Chapter 12 Troubleshooting" for details on handling errors during
transferring.
11. To read out the data from the GOT to the Memory
loader
The standard monitor OS, communication driver, project data, and resource data
are read out from the GOT to the memory loader. The operation procedure is
described below.
11.1 When the Data selection switch is [PROJECT + OS]
Project data
Communication driver
Standard monitor OS
Resource data
GT1020, GT1030
Memory loader
1) Turn OFF the Write protection switch.
2) Connect the memory loader to the GOT and turn ON the GOT.
3) Set the Data selection switch to [PROJECT + OS] and the RD/WR selection
switch to [RD], and select the data to be transferred and transfer direction.
4) Press the ENT key to determine the data to be transferred and transfer direction.
(SET/RUN LED will be orange.)
*: If the next operation is not performed within 30 seconds after the ENT key is
pressed, SET/RUN LED will be unlit, and the operations that have been made will
be canceled.
*: When the Data selection switch or the RD/WR selection switch is operated,
after the data to be transferred and the transfer direction are determined, the
operations that have been made will be canceled.
5) Press the ENT key again to start the transfer. (SET/RUN LED will be green
flashing.)
6) Turn OFF the GOT and remove the memory loader after the transfer is
completed. (SET/RUN LED will be green flashing.)
Refer to the "Chapter 12 Troubleshooting" for details on handling errors during
transferring.
11.2 When the Data selection switch is [PROJECT]
Project data
Resource data
GT1020, GT1030
Memory loader
1) Turn OFF the Write protection switch.
2) Connect the memory loader to the GOT and turn ON the GOT.
3) Set the Data selection switch to [PROJECT] and the RD/WR selection switch to
[RD], and select the data to be transferred and transfer direction.
4) Press the ENT key to determine the data to be transferred and transfer direction.
(SET/RUN LED will be orange.)
*: If the next operation is not performed within 30 seconds after the ENT key is
pressed, SET/RUN LED will be unlit, and the operations that have been made will be
canceled.
*: When the Data selection switch or the RD/WR selection switch is operated, after
the data to be transferred and the transfer direction are determined, the operations
that have been made will be canceled.
5) Press the ENT key again to start the transfer. (SET/RUN LED will be green flashing.)
6) Turn OFF the GOT and remove the memory loader after the transfer is completed.
(SET/RUN LED will be green flashing.)
Refer to the "Chapter 12 Troubleshooting" for details on handling errors during
transferring.

12. Troubleshooting

12.1 GOT error message
When communication between the GOT and the memory loader does not work, check
the following contents depending on the GOT error messages.
GOT error message
Remedy
Write protection
Write protection switch ON
switch is ON
Turn OFF the Write protection switch.
The GOT type that is set in the data to be transferred differs
Wrong GOT model is
from that of the GOT to which the data is transferred.
connected
Check the GOT type to which the memory loader is
connected.
The data to be transferred is broken, or the major version of
the standard monitor OS is different from that of the project
data.
 Write the standard monitor OS, communication driver, and
Corrupt data or OS
project data from GT Designer2 or GT Designer3 to the
version variance
memory loader again, and then transfer them to the GOT
again.
 Set the Data selection switch to [PROJECT + OS] and
read out all data from the GOT to the memory loader, and
then transfer them to the GOT again.
Communication error occurs between the GOT and the
memory loader.
 Check the connection with the communication cable.
Communication error
 Check that power supply is stable. (lighting of POWER
LED)
GOT contains a
Password is set in the project data.
system password
Reset the password with the numeric keypad on the GOT.
OS installation screen is not active
OS installation
Install the data after the OS installation screen is displayed on
screen isn't active
the GOT.
12.2 LED display on the memory loader
If communication cannot be established between the GOT and a PC using
memory loader, confirm the following status by checking display LED in memory
loader.
State of
Contents
POWER LED
The DC5V power supply from the GOT or the personal
POWER LED
computer is normally supplied. In case of no communication,
is lit.
check the status of ERROR LED.
The DC 5V power supply from the GOT or the personal
computer is not supplied. Check the items below.
 Turn ON the power.
POWER LED
 Check the connection with the USB cable.
is not lit.
 Check the connection with the GOT.
 Check that PLC is not overloaded when PLC supplies the
power to the GOT connected to the memory loader.
State of
Contents
ERROR LED
Write protection switch ON
Green light
Turn OFF the Write protection switch.
The GOT type that is set in the data to be transferred differs
Green
from that of the GOT to which the data is transferred.
flashing
Check the GOT type to which the memory loader is connected.
The data to be transferred is broken, or the major version of the
standard monitor OS is different from that of the project data.
 Write the standard monitor OS, communication driver, and
project data from GT Designer2 or GT Designer3 to the
Red light
memory loader again, and then transfer them to the GOT
again.
 Set the Data selection switch to [PROJECT + OS] and read
out all data from the GOT to the memory loader, and then
transfer them to the GOT again.
Communication error occurs between the GOT and the memory
loader.
Red flashing
 Check the connection with the communication cable.
 Check that power supply is stable. (lighting of POWER LED)
Password is set in the project data.
Red
Green
Reset the password with the numeric keypad on the GOT.
OS installation screen is not active
Orange
Install the data after the OS installation screen is displayed on
Green
the GOT.
This manual confers no industrial property rights or any rights of any other
kind, nor does it confer any patent licenses. Mitsubishi Electric Corporation
cannot be held responsible for any problems involving industrial property rights
which may occur as a result of using the contents noted in this manual.
Warranty
Mitsubishi will not be held liable for damage caused by factors found not to be
the cause of Mitsubishi; opportunity loss or lost profits caused by faults in the
Mitsubishi products; damage, secondary damage, accident compensation
caused by special factors unpredictable by Mitsubishi; damages to products
other than Mitsubishi products; and to other duties.
For safe use
This product has been manufactured as a general-purpose part for general
industries, and has not been designed or manufactured to be incorporated in
a device or system used in purposes related to human life.
Before using the product for special purposes such as nuclear power, electric
power, aerospace, medicine or passenger movement vehicles, consult with
Mitsubishi Electric.
This product has been manufactured under strict quality control. However
when installing the product where major accidents or losses could occur if the
product fails, install appropriate backup or failsafe functions in the system.
HEAD OFFICE : TOKYO BUILDING, 2-7-3 MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPAN

Advertisement

loading