Apportioned Electricity Billing Test Run Check List; Work Procedure And Check For System Expansion Work; Preparation; Notes About Expansion - Mitsubishi Electric AE-200A Service Handbook

Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

[VII Test run check lists for initial work and expansion work]

[4] Apportioned electricity billing test run check list

When using the apportioned electricity billing function, be sure to perform the billing test run.
To perform the billing test run using the AE-200, output the test run check sheet with Initial Setting Tool and then perform the check.
For details, refer to "7. Billing function trial run" in AE-200/AE-50/EW-50 Instruction Book (Apportioned Electricity Billing Function).
When using the apportioned electricity billing function with the TG-2000A, refer to Operation Manual (Site adjustment).

[5] Work procedure and check for system expansion work

This section describes the work procedure for adding air-conditioning units, general equipment, etc.

1. Preparation

(1) When air-conditioning units are added, the power needs to be shut off, so peak cut control will not be performed during that
time.
Furthermore, billing using the AE-200 and TG-2000A is also not possible.
Make sure that the owner understands the above.
(2) When adding equipment with the equivalent power consumption such as an indoor unit, PI controller, or ME remote controller,
check that the equivalent power supply is sufficient.

2. Notes about expansion

When expanding the air-conditioning system, please observe the following.
(1) Make sure that the owner understands that peak cut control will not be performed while the power of the PI controller, PLC, and
E-Energy is shut off.
(2) Before performing the expansion work and after performing the expansion work, save a backup of the data of the