Transport And Handling; By Receiving Inspection; Storage - ABB SafeRing Installation And Operating Instructions Manual

Sf6 insulated ring main unit and compact switchgear
Table of Contents

Advertisement

SafeRing / SafePlus
SF 6 insulated ring main unit and compact switchgear
Installation and operating instructions
NHP 408156
NHP 407789
6
NOPOWSR 5976 GB
NHP 304311

2. TRANSPORT AND HANDLING

The units are delivered from the factory ready for installation.
Weight table for standard
2-way DV
3-way CCV
4-way CCCV
4-way CCVV
3-way CCC
4-way CCCC
SafePlus
Standard 1-way
2–3 and 4-way as for SafeRing
5-way approx. between
M-metering cubicle approx.
The weights is without additional equipment
SafeRing / SafePlus is fitted with lifting lugs, but can also be
moved on pallets with a forklift truck.

2.1 BY RECEIVING INSPECTION

Upon receiving the SafeRing / SafePlus please check that the
delivered equipment has not been damaged during transport. If
any such damage has occurred, a claim must be submitted to
the carrier immediately.
After unpacking, the following must be checked:
1.
Operating handle – 1 piece should be included.
2.
Check that the pointer on the pressure indicator is in the
green area.
3.
Carry out a function test on the mechanical parts.
Any faults or omissions must be reported immediately to the
supplier.

2.2 STORAGE

SafeRing / SafePlus must be stored under cover in a dry and
well-ventilated area until it is installed and put into operation.
NHP 407791
SafeRing
252 kg
2-way DF
260 kg
313 kg
3-way CCF
320 kg
403 kg
4-way CCCF 410 kg
411 kg
4-way CCFF
430 kg
300 kg
390 kg
130 kg
480–600 kg
250 kg
ABB / PTMV

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Safering plus

Table of Contents