ABB RET650 2.1 IEC Commissioning Manual
ABB RET650 2.1 IEC Commissioning Manual

ABB RET650 2.1 IEC Commissioning Manual

Transformer protection
Table of Contents

Advertisement

Quick Links

®
Relion
650 series
Transformer protection RET650 2.1 IEC
Commissioning manual

Advertisement

Table of Contents
loading

Summary of Contents for ABB RET650 2.1 IEC

  • Page 1 ® Relion 650 series Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 3 Document ID: 1MRK 504 160-UEN Issued: January 2016 Revision: - Product version: 2.1 © Copyright 2016 ABB. All rights reserved...
  • Page 4 Copyright This document and parts thereof must not be reproduced or copied without written permission from ABB, and the contents thereof must not be imparted to a third party, nor used for any unauthorized purpose. The software and hardware described in this document is furnished under a license and may be used or disclosed only in accordance with the terms of such license.
  • Page 5 In case any errors are detected, the reader is kindly requested to notify the manufacturer. Other than under explicit contractual commitments, in no event shall ABB be responsible or liable for any loss or damage resulting from the use of this manual or the application of the equipment.
  • Page 6 (EMC Directive 2004/108/EC) and concerning electrical equipment for use within specified voltage limits (Low-voltage directive 2006/95/EC). This conformity is the result of tests conducted by ABB in accordance with the product standard EN 60255-26 for the EMC directive, and with the product standards EN 60255-1 and EN 60255-27 for the low voltage directive.
  • Page 7: Table Of Contents

    Setting up communication between PCM600 and the IED....29 Writing an application configuration to the IED.........34 Checking CT circuits.................35 Checking VT circuits.................36 Using the RTXP test switch.............. 36 Checking the binary input/output circuits..........37 Binary input circuits..............37 Binary output circuits..............37 Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 8 Releasing the function to be tested..........57 Verifying analog primary and secondary measurement....58 Testing the protection functionality........... 59 Forcing of binary input/output signals for testing......59 Forcing concept................59 How to enable forcing..............59 Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 9 EF4PTOC ......74 Four step directional earth fault protection......74 Four step non-directional earth fault protection......75 Completing the test..............75 Thermal overload protection, two time constants TRPTTR ..75 Checking operate and reset values........75 Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 10 Single command, 16 signals SINGLECMD......... 88 Logic....................89 Tripping logic, common 3-phase output SMPPTRC ....89 Three-phase operating mode..........89 1ph/3ph operating mode............89 1ph/2ph/3ph operating mode..........90 Circuit breaker lockout............91 Completing the test..............92 Monitoring..................92 Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 11 Section 12 Commissioning and maintenance of the fault clearing system............105 Commissioning tests..............105 Periodic maintenance tests............105 Visual inspection................106 Maintenance tests..............106 Preparation................106 Recording................107 Secondary injection.............. 107 Alarm test................107 Self supervision check............107 Trip circuit check..............107 Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 12 Table of contents Measurement of service currents......... 108 Restoring................109 Section 13 Glossary............... 111 Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 13: Section 1 Introduction

    The commissioning personnel must have a basic knowledge of handling electronic equipment. The commissioning and maintenance personnel must be well experienced in using protection equipment, test equipment, protection functions and the configured functional logics in the IED. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 14: Product Documentation

    The manual provides procedures for the checking of external circuitry and energizing the IED, parameter setting and configuration as Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 15: Document Revision History

    Related documents Documents related to RET650 Document numbers Application manual 1MRK 504 158-UEN Commissioning manual 1MRK 504 160-UEN Product guide 1MRK 504 161-BEN Technical manual 1MRK 504 159-UEN Type test certificate 1MRK 504 161-TEN Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 16: Document Symbols And Conventions

    Class 1 Laser product. Take adequate measures to protect the eyes and do not view directly with optical instruments. The caution icon indicates important information or warning related to the concept discussed in the text. It might indicate the presence of Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 17: Document Conventions

    -int is added to the signal name to indicate where the signal starts and continues. • Signal paths that extend beyond the logic diagram and continue in another diagram have the suffix ”-cont.” Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 18: Iec 61850 Edition 1 / Edition 2 Mapping

    EF4PTOC EF4LLN0 EF4PTRC EF4PTRC EF4RDIR EF4RDIR GEN4PHAR GEN4PHAR PH1PTOC PH1PTOC EFPIOC EFPIOC EFPIOC ETPMMTR ETPMMTR ETPMMTR FUFSPVC SDDRFUF FUFSPVC HZPDIF HZPDIF HZPDIF INDCALH INDCALH INDCALH ITBGAPC IB16FCVB ITBGAPC Table continues on next page Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 19 SCILO SCILO SCILO SCSWI SCSWI SCSWI SESRSYN RSY1LLN0 AUT1RSYN AUT1RSYN MAN1RSYN MAN1RSYN SYNRSYN SYNRSYN SINGLELCCH SCHLCCH SLGAPC SLGGIO SLGAPC SMBRREC SMBRREC SMBRREC SMPPTRC SMPPTRC SMPPTRC SP16GAPC SP16GGIO SP16GAPC Table continues on next page Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 20 VMSQI VNMMXU VNMMXU VNMMXU VSGAPC VSGGIO VSGAPC WRNCALH WRNCALH WRNCALH ZCLCPSCH ZCLCPLAL ZCLCPSCH ZCPSCH ZCPSCH ZCPSCH ZCRWPSCH ZCRWPSCH ZCRWPSCH ZCVPSOF ZCVPSOF ZCVPSOF ZMFPDIS ZMFLLN0 PSFPDIS PSFPDIS PSFPDIS ZMFPDIS ZMFPDIS ZMFPTRC ZMFPTRC ZMMMXU ZMMMXU Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 21: Section 2 Safety Information

    National and local electrical safety regulations must always be followed. Working in a high voltage environment requires serious approach to avoid human injuries and damage to equipment. Do not touch circuitry during operation. Potentially lethal voltages and currents are present. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 22 Take adequate measures to protect the eyes. Never look into the laser beam. The IED with accessories should be mounted in a cubicle in a restricted access area within a power station, station or industrial or retail environment. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 23: Caution Signs

    Changing the active setting group will inevitably change the IEDs operation. Be careful and check regulations before making the change. Note signs Observe the maximum allowed continuous current for the different current transformer inputs of the IED. See technical data. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 25: Section 3 Available Functions

    Four step residual overcurrent protection TRPTTR Thermal overload protection, two time constant CCRBRF 50BF Breaker failure protection Multipurpose protection CVGAPC General current and voltage protection 1) 67 requires voltage 2) 67N requires voltage Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 26: Control And Monitoring Functions

    TIMERSET, XOR FXDSIGN Fixed signal function block B16I Boolean 16 to Integer conversion BTIGAPC Boolean 16 to Integer conversion with Logic Node representation IB16 Integer to Boolean 16 conversion Table continues on next page Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 27 Supervison status for IEC 60870-5-103 I103USRDEF Status for user defined signals for IEC 60870-5-103 L4UFCNT Event counter with limit supervision TEILGAPC Running hour-meter Metering PCFCNT Pulse-counter logic ETPMMTR Function for energy calculation and demand handling Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 28: Communication

    Horizontal communication via GOOSE for interlocking GOOSEBINRCV GOOSE binary receive GOOSEDPRCV GOOSE function block to receive a double point value GOOSEINTRCV GOOSE function block to receive an integer value Table continues on next page Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 29: Basic Ied Functions

    Self supervision with internal event list SELFSUPEVLST Self supervision with internal event list TIMESYNCHGEN Time synchronization module BININPUT, Time synchronization SYNCHCAN, SYNCHGPS, SYNCHCMPPS, SYNCHLON, SYNCHPPH, SYNCHPPS, SNTP, SYNCHSPA, SYNCHCMPPS TIMEZONE Time synchronization Table continues on next page Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 30 LHMICTRL Local HMI signals LANGUAGE Local human machine language SCREEN Local HMI Local human machine screen behavior FNKEYTY1–FNKEYTY5 Parameter setting function for HMI in PCM600 FNKEYMD1– FNKEYMD5 Table continues on next page Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 31 IEC 61850 or function ANSI Description name LEDGEN General LED indication part for LHMI OPENCLOSE_LED LHMI LEDs for open and close keys GRP1_LED1– Basic part for CP HW LED indication module GRP1_LED15 GRP2_LED1– GRP2_LED15 GRP3_LED1– GRP3_LED15 Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 33: Section 4 Starting Up

    Circuit diagram • Setting list and configuration • RJ-45 Ethernet cable (CAT 5) • Three-phase test kit or other test equipment depending on the complexity of the configuration and functions to be tested. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 34: Checking The Power Supply

    To ensure that the IED is according to the delivery and ordering specifications documents delivered together with each IED, the user should also after start-up use the built in HMI to check the IED's: Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 35: Ied Start-Up Sequence

    PCM600. When an Ethernet-based station protocol is used, PCM600 communication can use the same Ethernet port and IP address. To connect PCM600 to the IED, two basic variants must be considered. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 36 Figure 3: Point-to-point link between IED and PCM600 The following description is an example valid for standard PCs using Microsoft Windows operating system. The example is taken from a Laptop with one Ethernet interface. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 37 Select Search programs and files in the Start menu in Windows. IEC13000057-1-en.vsd IEC13000057 V1 EN Figure 4: Select: Search programs and files Type View network connections and click on the View network connections icon. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 38 Right-click and select Properties. IEC13000059-1-en.vsd IEC13000059 V1 EN Figure 6: Right-click Local Area Connection and select Properties Select the TCP/IPv4 protocol from the list of configured components using this connection and click Properties. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 39 IP address is not set to be obtained automatically by the IED, see Figure 8. The IP address must be different from the IP address chosen for the IED. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 40: Writing An Application Configuration To The Ied

    The red LED on the IED flashes, and the green LED is lit while the IED is in the configuration mode. When the configuration is written and completed, the IED is automatically set into normal mode. For further instructions please refer to the users manuals for PCM600. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 41: Checking Ct Circuits

    IED when plotting the excitation characteristics. If the CT secondary circuit earth connection is removed without the current transformer primary being de-energized, dangerous voltages may result in the secondary CT circuits. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 42: Checking Vt Circuits

    IED is in test mode. Before removing the test handle, check the measured values in the IED. Not until the test handle is completely removed, the trip and alarm circuits are restored for operation. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 43: Checking The Binary Input/Output Circuits

    Preferably, disconnect the binary output connector from the binary output cards. Check all connected signals so that both load and polarity are in accordance with IED specifications. 4.11 Checking optical connections Check that the Tx and Rx optical connections are correct. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 44 An IED equipped with optical connections has an minimum space requirement of 180 mm for plastic fiber cables and 275 mm for glass fiber cables. Check the allowed minimum bending radius from the optical cable manufacturer. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 45: Section 5 Configuring The Ied And Changing Settings

    IED. After that time has elapsed, it will be safe to turn the IED off, no data will be lost. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 46: Configuring Analog Ct Inputs

    Take the rated permissive overload values for the current inputs into consideration. Supervision of input/output modules I/O modules configured with PCM600 (BIM, BOM or IOM) are supervised. I/O modules that are not configured are not supervised. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 47 Each logical I/O module has an error flag that indicates signal or module failure. The error flag is also set when the physical I/O module of the correct type is not detected in the connected slot. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 49: Section 6 Establishing Connection And Verifying The Spa/Iec Communication

    When using the IEC protocol, the rear SPA/IEC port must be set for IEC use. Two types of interfaces can be used: • for plastic fibres with connector type HFBR • for glass fibres with connectors type ST Procedure Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 50: Verifying The Communication

    SMS/SCS system are as expected. 6.2.2 Verifying IEC communication To verify that the IEC communication with the IEC master system is working, there are some different methods. Choose one of the following. Procedure Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 51: Fibre Optic Loop

    Losses in connection box, two contacts (0.5 dB/contact) 1 dB Losses in connection box, two contacts (1 dB/contact) 2 dB Margin for 2 repair splices (0.5 dB/splice) 1 dB Maximum total attenuation 11 dB 7 dB Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 53: Section 7 Establishing Connection And Verifying The Lon Communication

    An optical network can be used within the station automation system. This enables communication with the IEDs through the LON bus from the operator’s workplace, from the control center and also from other IEDs via bay-to-bay horizontal communication. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 54: The Lon Protocol

    Use the LON Network Tool (LNT) to set the LON communication. This is a software tool applied as one node on the LON bus. To communicate via LON, the IEDs need to know Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 55 Unit Parameter description NeuronID* 0 - 12 Not loaded Neuron hardware identification number in hexadecimal code Location 0 - 6 No value Location of the node *Can be viewed in the local HMI Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 56: Optical Budget Calculation For Serial Communication With Lon

    Losses in connection box, two contacts (0.75 dB/contact) 1.5 dB Losses in connection box, two contacts (1dB/contact) 2 dB Margin for repair splices (0.5 dB/splice) 0.5 dB Maximum total attenuation 11 dB 7 dB Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 57: Section 8 Establishing Connection And Verifying The Iec 61850 Communication

    (for example LANAB). Enable redundant IEC 61850-8-1 communication for port AB and CD 2.1. Enable redundant communication. Navigate to: Main menu/Configuration/Communication/Ethernet configuration/PRP:1 Set values for Operation, IPAddress and IPMask. Operation must be set to Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 58: Verifying The Communication

    LAN-A-STATUS or LAN-B-STATUS (depending on which connection that was removed) are shown as Error and the that other signal is shown as Ok. Be sure to re- connect the removed connection after completed verification. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 59: Section 9 Testing Ied Operation

    Prepare the IED for test before testing a particular function. Consider the logic diagram of the tested protection function when performing the test. All included functions in the IED are tested according to the corresponding test instructions in this Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 60: Preparing The Ied To Verify Settings

    IED. To make testing even more effective, use PCM600. PCM600 includes the Signal monitoring tool, which is useful in reading the individual currents and voltages, their Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 61: Activating The Test Mode

    Press the left arrow to exit the menu. The dialog box Save changes appears. Choose Yes, press E and exit the menu. The yellow startLED above the LCD will start flashing when the IED is in test mode. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 62: Preparing The Connection To The Test Equipment

    Connect the current and voltage terminals. Pay attention to the current polarity. Make sure that the connection of input and output current terminals and the connection of the residual current conductor is correct. Check that the input and output logical signals Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 63: Releasing The Function To Be Tested

    BLOCK input signal on the corresponding function block is active, which depends on the configuration. Ensure that the logical status of the BLOCK input signal is equal to 0 for the function to be tested. Event function blocks can also Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 64: Verifying Analog Primary And Secondary Measurement

    Inject an unsymmetrical three-phase voltage and current, to verify that phases are correctly connected. If some setting deviates, check the analog input settings under Main menu/Settings/General settings/Analog modules Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 65: Testing The Protection Functionality

    LHMI/PCM600 menus that relate to forcing will not have any effect on the input/output status due to safety reasons. 9.8.2.1 Enable forcing by using LHMI Enable IED TESTMODE by setting IEDTestMode to On under Main menu/ Test/IED test mode/TESTMODE:1. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 66: Enable Forcing Using Testmode Function Block

    Edit the input/output value directly to select the desired logical level, by doing following: Select the value line of the desired signal, see figure 11. Press the Enter key to edit the value. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 67 It is possible to power-cycle the IED in this state without losing the forcing states and values. This means that once a signal is forced, and the IED remains in IED test mode, the input or output will appear Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 68: Forcing By Using Pcm600

    (described in step 6 below) and to undo all forcing. Right click on the IED in the plant structure and select Signal Monitoring. Click on the List View tab. Click Forcing Session in the menu IED/Start Forcing. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 69 Select and edit the values. Click Acknowledge and send. IEC15000026 V1 EN This commits the values to the IED and exits the editing session. Click Cancel to abort the changes and revert back to actual IED values. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 70: How To Undo Forcing Changes And Return The Ied To Normal Operation

    Set IEDTestMode to Off in the LHMI menu. Exit from the menu and click Yes in the Save dialogue box. This immediately undoes all forcing, regardless of how it was accomplished and disabled. 9.8.4.3 Undo forcing by using PCM600 Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 71 LHMI. If the IED is left in test mode, then it is still possible to perform new forcing operations, both from LHMI and from PCM600 Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 73: Section 10 Testing Functionality By Secondary Injection

    The Manual Trig can be started in two ways: From the local HMI under Main menu/Disturbance records. 1.1. Enter on the row at the bottom of the HMI called Manual trig. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 74: Event Recorder (Er) And Event List (El)

    When the IED is brought into normal service it is recommended to delete all events resulting from commissioning tests to avoid confusion in future fault analysis. All events in the IED can be cleared in the local HMI under Main Menu//Clear/Clear Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 75: Identifying The Function To Test In The Technical Reference Manual

    Check in the same way the function by injecting current in phases L2 and L3 respectively. Inject a symmetrical three-phase current and note the operate value. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 76: Completing The Test

    Switch on the current and note the operate time. Connect the test set to terminal L1 and neutral of the three-phase current input configured to REFPDIF. Also inject a current higher than half the Idmin setting Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 77: Completing The Test

    Inject a phase current into the IED with an initial value below that of the setting. Set the operation mode to 1 out of 3. Increase the injected current in the Ln phase until the TRL (n=1–3) signal appears. Switch the fault current off. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 78: Completing The Test

    3.1. Set the injected polarizing voltage slightly larger than the set minimum polarizing voltage (default is 5% of UBase) and set the injection current to lag the appropriate voltage by an angle of about 80° if forward directional function is selected. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 79: Completing The Test

    Instantaneous residual overcurrent protection EFPIOC Prepare the IED for verification of settings outlined in section "Preparing the IED to verify settings". To verify the settings the following fault type should be tested: • Phase-to-earth fault Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 80: Measuring The Operate Limit Of Set Values

    If the test has been performed by injection of current in phase L1, repeat the test, injecting current into terminals L2 and L3 with a polarizing voltage connected to terminals L2, respectively L3. Block lower set steps when testing higher set steps according to the instructions that follow. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 81: Four Step Non-Directional Earth Fault Protection

    IBase1, increase the current in phase L1 until stage IBase1operates and note the operate value. Observe the maximum permitted overloading of the current circuits in the IED. Decrease the current slowly and note the reset value. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 82: Completing The Test

    An external START signal can also be used. To verify the settings in the most common back-up trip mode 1 out of 3, it is sufficient to test phase-to-earth faults. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 83: Checking The Phase Current Operate Value, Ip

    Check the re-trip t1 and back-up trip times t2 and t3. In applicable cases, the back-up trip for multi-phase start t2MPh and back-up trip 2, t2 and t3 can also be checked. To check t2MPh, a two-phase or three-phase start shall be applied. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 84: Verifying The Re-Trip Mode

    Interrupt the current, with a margin before back-up trip time, t2. It may be made at issue of re-trip command. Check that re-trip is achieved, if selected, but no back-up trip is obtained. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 85: Verifying Instantaneous Back-Up Trip At Cb Faulty Condition

    Keep the input activated. Apply the fault condition, including start of CCRBRF, with current above set current value. Verify that back-up trip is obtained without intentional delay, for example within 20ms from application of start. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 86: Verifying The Case Retripmode = Contact

    Verify that phase selection re-trip (if selected) and back-up trip are achieved after set times. Failure to trip is simulated by keeping the signal(s) CB closed activated. Disconnect the input signal and the START signal(s). Keep the CB closed signal(s). Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 87: Completing The Test

    CVGAPC function block, it is hardly possible to define a fully covering general commissioning test. 10.5.1.1 Built-in overcurrent feature (non-directional) Procedure Go to Main menu/Test/Function test modes/Multipurpose protection/ GeneralCurrentVoltage(GAPC)/CVGAPC:x and make sure that CVGAPC Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 88: Overcurrent Feature With Current Restraint

    IED. Inject current(s) and voltage(s) in a way that relevant measured (according to setting parameter CurrentInput and VoltageInput) currents and voltages are created from the test set. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 89: Overcurrent Feature With Directionality

    Reverse the direction of the injection current and check that the protection does not operate. Check with low polarization voltage that the feature becomes non-directional, blocked or with memory according to the setting. 10.5.1.5 Over/Undervoltage feature Procedure Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 90: Completing The Test

    All undervoltage-dependent functions must be blocked. Disconnect the dc voltage from the MCBOP binary input terminal. Disconnect one of the phase voltages and observe the logical output signals on the binary outputs of the IED. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 91: Measuring The Operate Value For The Negative Sequence Function

    2. Then slowly increase the measured current in one phase until the BLKU signal disappears. Record the measured current and calculate the corresponding negative-sequence current according to the equation (observe that the currents in the equation are phasors): Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 92: Measuring The Operate Value For The Zero-Sequence Function

    2. Then slowly increase the measured current in one phase until the BLKU signal disappears. Record the measured current and calculate the corresponding zero-sequence current according to the equation (observe that the currents in the equation are phasors): Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 93: Measuring The Operate Value For The Dead Line Detection Function

    Change the voltages and currents in all three phases simultaneously. The voltage change must be higher than the set value DU> and the current change must be higher than the set value DI<. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 94: Completing The Test

    10.7.2 Single command, 16 signals SINGLECMD For the single command function block, it is necessary to configure the output signal to corresponding binary output of the IED. The operation of the single command Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 95: Logic

    The autorecloser function SMBRREC has the functionality such as the long trip time, CB ready and so on, which can prevent a proper single-phase tripping and autoreclose. To by-pass this problem the fault initiation should be Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 96: 1Ph/2Ph/3Ph Operating Mode

    Take an adequate time interval between faults into consideration, to overcome a reclaim time, which is activated by the autorecloser function SMBRREC. Only a single-phase trip should occur for each separate fault and only one of the trip Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 97: Circuit Breaker Lockout

    10.8.1.4 Circuit breaker lockout The following tests should be carried out when the built-in lockout function is used in addition to possible other tests, which depends on the complete configuration of an IED. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 98: Completing The Test

    Check that the input logical signal BLOCK is logical zero and that on the local HMI, the logical signals PRES_ALM, PRES_LO, TEMP_ALM and TEMP_LO are equal to logical zero. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 99: Testing The Liquid Medium Supervision For Alarm And Lock Out Conditions

    HMI under Main menu/Test/Function status/Monitoring/ Liquid medium supervision SSIML/LVL_LO Reduce the liquid level input below LevelAlmLimit, check for LVL_ALM signal status in local HMI under Main menu/Test/Function status/Monitoring/ Liquid medium supervision SSIML/LVL_ALM Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 100: Completing The Test

    TTRVOP and travel time to close TTRVCL exceed the respective set values (tTrOpenAlm and tTrCloseAlm). The measured travel time for opening and closing is shown on TTRVOP and TTRVCL respectively. 4.3. Check that TRVTOPAL and TRVTCLAL are activated. Test of CB status Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 101 8.3. OPERALM is activated when NOOPER value exceeds the set OperAlmLevel value. The actual value can be read on the output NOOPER. 8.4. OPERLO is activated when NOOPER value exceeds the set OperLOLevel value. Test of CB spring charge monitoring Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 102: Completing The Test

    When the function is configured, test it together with the function that operates it. Trig the function and check that the counter result corresponds to the number of operations. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 103: Completing The Test

    Similarly check after each 1 minute whether the calculated integrated energy value and EAFACC and ERFACC outputs are matching. After some time (multiple of minute) remove the current and voltage input from CVMMXN function block. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 104: Completing The Test

    Completing the test Continue to test another function or end the test by changing the TESTMODE setting to Off. Restore connections and settings to their original values, if they were changed for testing purposes. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 105: Station Communication

    Operating procedures for the PC aided methods of changing the active setting groups are described in the corresponding PCM600 documents and instructions for the operators within the SCS are included in the SCS documentation. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 106: Completing The Test

    The following procedure is used to return to normal operation. Navigate to the test mode folder. Change the On setting to Off. Press the 'E' key and the left arrow key. Answer YES, press the 'E' key and exit the menus. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 107: Section 11 Checking The Directionality

    • for reverse (imported) load: 165 deg < PHI < 295 deg The directionality of the load current is shown by the Distance protection ZMFPDIS under the HMI menu: Main menu/Test/Function status/Impedance protection/Distance Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 108 (exporting) resistive load (active power), while a negative sign indicates a reverse (importing) resistive load (active power). Usually it is enough to look at the resistive values to get information of the load direction, that must anyway be Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 109 Section 11 1MRK 504 160-UEN - Checking the directionality compared with the indication given by external equipment measuring the same power flow. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 111: Section 12 Commissioning And Maintenance Of The Fault Clearing System

    The periodicity of all tests depends on several factors, for example the importance of the installation, environmental conditions, simple or complex equipment, static or electromechanical IEDs, and so on. The normal maintenance praxis of the user should be followed. However, ABB's recommendation is as follows: Every second to third year •...
  • Page 112: Visual Inspection

    IED at a time on live circuits where redundant protection is installed and de- energization of the primary circuit is not allowed. ABB protection IEDs are preferably tested by aid of components from the COMBITEST testing system described in information B03-9510 E. Main...
  • Page 113: Recording

    If the circuit is not provided with a continuous trip-circuit supervision, it is possible to check that circuit is really closed when the test-plug handle has been removed by using a high-ohmic Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 114: Measurement Of Service Currents

    The neutral-point voltage to an earth-fault protection IED is checked. The voltage is normally 0.1 to 1V secondary. However, voltage can be considerably higher due to harmonics. Normally a CVT secondary can have around 2.5 - 3% third-harmonic voltage. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 115: Restoring

    Thus a list should be prepared of all items disturbed during test so that all can be put back into service quickly and without overlooking something. It should be put back into service item by item and signed by the responsible engineer. Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 117: Section 13 Glossary

    Binary signal transfer function, receiver blocks Binary signal transfer function, transmit blocks C37.94 IEEE/ANSI protocol used when sending binary signals between IEDs Controller Area Network. ISO standard (ISO 11898) for serial communication Circuit breaker Combined backplane module Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 118 Delayed autoreclosing DARPA Defense Advanced Research Projects Agency (The US developer of the TCP/IP protocol etc.) DBDL Dead bus dead line DBLL Dead bus live line Direct current Data flow control Discrete Fourier transform Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 119 Electrical and functional description for digital lines used by local telephone companies. Can be transported over balanced and unbalanced lines Communication interface module with carrier of GPS receiver module Graphical display editor within PCM600 General interrogation command Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 120 IED, they are referred to as instances of that function. One instance of a function is identical to another of the same kind but has a different number in the IED user interfaces. The word "instance" is sometimes defined as an Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 121 Multifunction vehicle bus. Standardized serial bus originally developed for use in trains. National Control Centre Number of grid faults Numerical module OCO cycle Open-close-open cycle Overcurrent protection Optical Ethernet module OLTC On-load tap changer Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 122 Serial link according to EIA standard RS485 Real-time clock Remote terminal unit Substation Automation Select-before-operate Switch or push button to close Short circuit location Station control system SCADA Supervision, control and data acquisition Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 123 Time delayed earth-fault protection function Transport Layer Security Transmit (disturbance data) TNC connector Threaded Neill-Concelman, a threaded constant impedance version of a BNC connector Trip (recorded fault) TPZ, TPY, TPX, TPS Current transformer class according to IEC Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 124 Voltage transformer Three times zero-sequence current.Often referred to as the residual or the earth-fault current Three times the zero sequence voltage. Often referred to as the residual voltage or the neutral point voltage Transformer protection RET650 2.1 IEC Commissioning manual...
  • Page 126 Contact us Note: For more information please contact: We reserve the right to make technical changes or modify the contents of this document without prior notice. ABB AB ABB AB does not accept any responsibility whatsoever for potential Substation Automation Products errors or possible lack of information in this document.