Applying Schedule - LG AC Smart II Owner's Manual

Advanced control smart ii
Table of Contents

Advertisement

Web schedule function

Applying schedule

Schedule refers to the process of adding the application period information to the schedule group and
schedule pattern previous set and designating the period for the unit (Indoor unit, ventilator, On/Off
unit, AWHP) to operate for the applicable period.
AC SMART II provides the schedule wizard to easily apply the schedule. The schedule wizard is
composed of total of 6 stages as shown below. But, the schedule copying between groups is done
through a separate 2 stage process.
1
1. Select to add/edit schedule
3
3. Select schedule start/end date
5
5. Check/edit schedule
38
AC Smart II (Advanced Control Smart II)
2
2. Select to add/edit schedule
4
4. Apply set weekly schedule pattern
6
6. Set exception date not to apply
schedule