Installing 14G Systems In Sliding Rails - Dell PowerEdge R940 Technical Manual

Latest 4-socket, 3u monolithic rack server designed for complex workloads using highly scalable memory and network options
Hide thumbs Also See for PowerEdge R940:
Table of Contents

Advertisement

NOTE:
The 2U system requires two people for installation due to its heavier weight.

Installing 14G Systems in Sliding Rails

To install the 14G system in sliding rails:
1
Pull the inner slide rails out of the rack until they lock into place.
Hold the system by its front and back ends and tilt the front end upward slightly.
Check the window on the sides of both rails to confirm that the heads of the standoffs are visible before adjusting or releasing
your grip on the back end of the system.
Use your free hand to hold the rail against the side of the chassis if needed as the system is rotated downward into the remaining
J-slots.
2
Locate the rear rail standoff on each side of the system and lower them into the rear J-slots of the slide assembly.
3
Rotate the system downward until all the rail standoffs are seated in the J-slots.
4
Push the system inward until the lock levers click into place. Press the slide-release lock buttons on both rails and slide the system into
the rack.
30
Rack Rails

Advertisement

Table of Contents
loading

Table of Contents