Periodic maintenance work
Maximum temperature at turbine inlet during cleaning
During cleaning, the temperature at the turbine inlet will rise and may strain
the material significantly.
CAUTION
Make sure the maximum temperature at the turbine inlet is not exceeded
during cleaning.
Figure 21: Carrying out wet cleaning of turbines
Fulfil prerequisites.
Ensure that the water supply (01) is guaranteed.
Open the stop valve (02) and set the water volume flow V
cleaning parameters).
Close the stop valve (02) after 10 minutes.
Wait for 10 minutes; do not change the load during this stabilisation phase.
If the cleaning result is unsatisfactory or there is water leakage, contact an ABB Turbocharg-
ing Service Station.
Product
Temperature before
turbine before clean-
ing [°C]
A150
350 ... 430
A155
350 ... 430
Table 13: Wet cleaning of turbines, parameters for 1-nozzle cleaning
Corresponds to a water pressure p
1)
before the cleaning nozzle
Product
Temperature before
turbine before clean-
ing [°C]
A150
350 ... 430
A155
350 ... 430
Table 14: Wet cleaning of turbines, parameters for 6-nozzle cleaning
Corresponds to a water pressure p
1)
the connection point WA/WG
© Copyright 2017 ABB. All rights reserved.
Maximum tempera-
ture before turbine
during cleaning [°C]
530
530
of 1.5 bar (overpressure compared to atmosphere)
WT
Maximum tempera-
ture before turbine
during cleaning [°C]
530
530
of 2.5 bar (overpressure compared to atmosphere) at
WT
HZTL4032_EN
with a flowmeter (03) (see
W
Water volume flow
V
[dm
/min]
3
1)
W
14.0
19.0
Water volume flow
V
[dm
/min]
3
1)
W
18.0
25.0
Revision F
Page 49 / 120
Injection time
[min]
10
10
Injection time
[min]
10
10
January 2017