Power2 performance package The assembly instructions explain how the low- and high- Two-stage turbocharging solution for highest turbocharging pressure stage of ABB Turbo Systems is fitted to the engine efficiency correctly and without any health and safety risks. Target group...
Introduction Purpose of the assembly instructions The assembly instructions explain how the low- and high-pressure stage of ABB Turbo Sys- tems is fitted to the engine correctly and without any health and safety risks. This element of the documentation is supplied with the product, as is required for partly completed machinery in accordance with machinery directive 2006/42EC.
Page 5
Official service stations of ABB Turbo Systems Official service stations are identified in this document as ABB Turbocharging Service Sta- tions. They are regularly audited and certified by ABB Turbo Systems. See "Contact Infor- mation" on our website at www.abb.com/turbocharging.
Safety Introduction The two-stage turbocharging system (Power2) manufactured by ABB Turbo Systems is state of the art and complies with the respective health and safety standards in effect at the time the system was built. Thus Power2 is safe to operate. Nevertheless, there may be some residual...
Page 12
Page 10 / 21 pressure stages Swivel lifting eyes to be used Two swivel lifting eyes (S) are required for the safe lifting of loads. These are not included in the ABB Turbo Systems scope of delivery. Swivel lifting eye (S) Power2 Thread...
Installing the low-pressure stage Fixing elements and installation force The fixing screws for fastening the low-pressure stage are not included in the ABB Turbo Sys- tems scope of delivery and must be designed by the enginebuilder in accordance with the following details.
Gaskets are required in the bracket for sealing the interface of the oil pipes between the bracket and the low-pressure stage. These gaskets are not included in the ABB Turbo Sys- tems scope of delivery and must be provided by the enginebuilder.
Installing the low-pressure stage Page 13 / 21 Gas and air lines The gas and air line gaskets are not included in the ABB Turbo Systems scope of delivery and must be provided by the enginebuilder. Assembly procedure Figure 6: Installing the low-pressure stage Attach lifting gear to the two suspension points of the bearing casing.
Fixing elements and installation force The fixing screws and sleeves for fastening the high-pressure stage are not included in the ABB Turbo Systems scope of delivery and must be designed by the enginebuilder in accord- ance with the following details.
Gaskets are required in the bracket for sealing the interface of the oil pipes between the bracket and the high-pressure stage. These gaskets are not included in the ABB Turbo Sys- tems scope of delivery and must be provided by the enginebuilder.
Storage of new low-pressure and high-pressure stages and cartridge groups for up to 6 months New low-pressure and high-pressure stages and cartridge groups from ABB Turbo Systems can be stored in their closed packages for 6 months from the date of delivery without addition- al mothballing measures (indicated by VCI label on package).
Page 21
or the cartridge group must be checked and repackaged by an ABB Turbocharging Service Station. After every 3 years, the following steps must be carried out by an ABB Turbocharging Service Station: Checking the component Replacing the desiccant ...
Operation Manual / Contact information ABB Turbo Systems Ltd Further information Bruggerstrasse 71 a Find your local service team on our website (see CH-5401 Baden/ Switzerland section “contact us“ / “Contact information”). Phone: +41 58 585 7777 Fax: +41 58 585 5144 Find and download the Operation Manual of your product on our website (see “Need product...