Installing/Removing Modules; Installing A Module - Siemens RUGGEDCOM RX5000 Installation Manual

Hide thumbs Also See for RUGGEDCOM RX5000:
Table of Contents

Advertisement

RUGGEDCOM RX5000
Installation Guide
CAUTION!
Electrical hazard – risk of damage to equipment. Make sure all electrostatic energy is dissipated before
performing installing or removing components from the device. An electrostatic discharge (ESD) can
cause serious damage to the component once it is outside the chassis.
1.
Make sure all potential electrostatic build-up has been properly discharged to prevent electrostatic
discharges (ESD). This can be accomplished by wearing an ESD wrist strap or by touching Earth or the
chassis ground.
2.
Disconnect the cable from the port.
3.
Swing the metal bail-latch down and pull the port from the module.
Figure 26: Removing an SFP Optical Port (Typical)
1. SFP Optical Port
4.
Store the port in an ESD-safe bag or other suitable ESD-safe environment, free from moisture and stored at
the proper temperature (-40 to 85 °C or -40 to 185 °F).
5.
Insert a plug in the empty port opening to prevent the ingress of dust and dirt.
Section 3.6

Installing/Removing Modules

The following sections describe how to install and remove modules:
Section 3.6.1, "Installing a Module"
Section 3.6.2, "Removing a Module"
Section 3.6.1

Installing a Module

Upon installing a new module in the device, all the features associated to the module are available in the
operating system. For more information, refer to the ROX II User Guide for the RX5000.
To install a module, do the following:
1.
Make sure power to the device has been disconnected and wait approximately two minutes for any
remaining energy to dissipate.
2.
If the device is installed in a rack, remove it from the rack.
3.
Remove the current module from the slot. For more information, refer to
Installing/Removing Modules
2. Metal Bail-Latch
1
2
Section 3.6.2, "Removing a
Chapter 3
Communication Ports
Module".
25

Advertisement

Table of Contents
loading

Table of Contents