Procedure for automatic gas switching operation check.
When the installation of MCO-5GC is completed, check the automatic gas switching operation
according to the following to the following procedures.
1
Stop the gas supply of cylinder A and use cylinder B only for CO
2
Turn on the power switch of MCO-5M and set 37decC and 0%.
Turn on CO
gas supply line indicator with CO
2
3
Wait for approx.1 minute until CO
(It takes about 1 minute until CO
4
Set the CO
density to 5% and check CO
2
NOTE: CO
inject lamp may not light depending on the temperature, humidity or
2
CO
density in the chamber. In this case, set the CO
2
higher than the displayed value.
5
Check the E01(CO
2-7minutes later from the CO
6
Check the CO
stably.
NOTE: CO
density control is interrupted when automatic calibration of CO
2
is activated and the decimal point of CO
7
This is the end of check procedure.
Press the buzzer key to disappear "E01" and select the cylinder A with CO
supply select key.
Set the CO
density to 0% and open the door to release the CO
2
After the chamber temperature and humidity are stable, set the CO
desired value.
Refer to the MCO-5M instruction manual for usage of MCO-5GC
2
control is effective after power ON.)
2
gas cylinder empty alarm) and buzzer turn on about
2
inject lamp's turning on.
2
gas density indicator reaches to the set value 5% and keep it
2
procedure
gas supply line switching key.
2
control is available.
inject lamp lights.
2
density indicator blinks.
2
53
gas supply.
2
density 1% or more
2
sensor
2
gas
2
gas completely.
2
density to
2
7FB6P104047000