GE N60 Instruction Manual page 232

Network stability and synchrophasor measurement system ur series
Hide thumbs Also See for N60:
Table of Contents

Advertisement

5.5 FLEXLOGIC™
Table 5–8: N60 FLEXLOGIC™ OPERANDS (Sheet 3 of 7)
OPERAND TYPE
OPERAND SYNTAX
ELEMENT:
FxE 1 PKP
FlexElements™
FxE 1 OP
FxE 1 DPO
FxE 2 to 16
ELEMENT
LATCH 1 ON
Non-volatile latches
LATCH 1 OFF
LATCH 2 to 16
ELEMENT:
OPEN POLE OP ФA
Open pole detector
OPEN POLE OP ФB
OPEN POLE OP ФC
OPEN POLE OP
ELEMENT:
OVERFREQ 1 PKP
Overfrequency
OVERFREQ 1 OP
OVERFREQ 1 DPO
OVERFREQ 2 to 4
ELEMENT:
PHASE IOC1 PKP
Phase
PHASE IOC1 OP
instantaneous
PHASE IOC1 DPO
overcurrent
PHASE IOC1 PKP A
PHASE IOC1 PKP B
PHASE IOC1 PKP C
PHASE IOC1 OP A
PHASE IOC1 OP B
PHASE IOC1 OP C
PHASE IOC1 DPO A
PHASE IOC1 DPO B
PHASE IOC1 DPO C
5
PHASE IOC2 to 12
ELEMENT:
PHASE OV1 PKP
Phase overvoltage
PHASE OV1 OP
PHASE OV1 DPO
PHASE OV1 PKP A
PHASE OV1 PKP B
PHASE OV1 PKP C
PHASE OV1 OP A
PHASE OV1 OP B
PHASE OV1 OP C
PHASE OV1 DPO A
PHASE OV1 DPO B
PHASE OV1 DPO C
ELEMENT:
PHASE UV1 PKP
Phase undervoltage
PHASE UV1 OP
PHASE UV1 DPO
PHASE UV1 PKP A
PHASE UV1 PKP B
PHASE UV1 PKP C
PHASE UV1 OP A
PHASE UV1 OP B
PHASE UV1 OP C
PHASE UV1 DPO A
PHASE UV1 DPO B
PHASE UV1 DPO C
PHASE UV2 to 3
ELEMENT:
PMU 1 CURR TRIGGER
Synchrophasor
PMU 1 FREQ TRIGGER
phasor
PMU 1 POWER TRIGGER
measurement unit
PMU 1 ROCOF TRIGGER
(PMU)
PMU 1 VOLT TRIGGER
PMU 1 TRIGGERED
PMU 2 to 4
ELEMENT:
PMU ONE-SHOT EXPIRED
Synchrophasor one-
shot
PMU ONE-SHOT OP
PMU ONE-SHOT PENDING
5-102
OPERAND DESCRIPTION
FlexElement™ 1 has picked up
FlexElement™ 1 has operated
FlexElement™ 1 has dropped out
Same set of operands as shown for FxE 1
Non-volatile latch 1 is ON (Logic = 1)
Non-volatile latch 1 is OFF (Logic = 0)
Same set of operands as shown for LATCH 1
Open pole condition is detected in phase A
Open pole condition is detected in phase B
Open pole condition is detected in phase C
Open pole detector is operated
Overfrequency 1 has picked up
Overfrequency 1 has operated
Overfrequency 1 has dropped out
Same set of operands as shown for OVERFREQ 1
At least one phase of phase instantaneous overcurrent 1 has picked up
At least one phase of phase instantaneous overcurrent 1 has operated
All phases of phase instantaneous overcurrent 1 have dropped out
Phase A of phase instantaneous overcurrent 1 has picked up
Phase B of phase instantaneous overcurrent 1 has picked up
Phase C of phase instantaneous overcurrent 1 has picked up
Phase A of phase instantaneous overcurrent 1 has operated
Phase B of phase instantaneous overcurrent 1 has operated
Phase C of phase instantaneous overcurrent 1 has operated
Phase A of phase instantaneous overcurrent 1 has dropped out
Phase B of phase instantaneous overcurrent 1 has dropped out
Phase C of phase instantaneous overcurrent 1 has dropped out
Same set of operands as shown for PHASE IOC1
At least one phase of overvoltage 1 has picked up
At least one phase of overvoltage 1 has operated
All phases of overvoltage 1 have dropped out
Phase A of overvoltage 1 has picked up
Phase B of overvoltage 1 has picked up
Phase C of overvoltage 1 has picked up
Phase A of overvoltage 1 has operated
Phase B of overvoltage 1 has operated
Phase C of overvoltage 1 has operated
Phase A of overvoltage 1 has dropped out
Phase B of overvoltage 1 has dropped out
Phase C of overvoltage 1 has dropped out
At least one phase of phase undervoltage 1 has picked up
At least one phase of phase undervoltage 1 has operated
All phases of phase undervoltage 1 have dropped out
Phase A of phase undervoltage 1 has picked up
Phase B of phase undervoltage 1 has picked up
Phase C of phase undervoltage 1 has picked up
Phase A of phase undervoltage 1 has operated
Phase B of phase undervoltage 1 has operated
Phase C of phase undervoltage 1 has operated
Phase A of phase undervoltage 1 has dropped out
Phase B of phase undervoltage 1 has dropped out
Phase C of phase undervoltage 1 has dropped out
Same set of operands as shown for PHASE UV1
Overcurrent trigger of phasor measurement unit 1 has operated
Abnormal frequency trigger of phasor measurement unit 1 has operated
Overpower trigger of phasor measurement unit 1 has operated
Rate of change of frequency trigger of phasor measurement unit 1 has
operated
Abnormal voltage trigger of phasor measurement unit 1 has operated
Phasor measurement unit 1 triggered; no events or targets are generated by
this operand
Same set of operands as shown for PMU 1
Indicates the one-shot operation has been executed, and the present time is
at least 30 seconds past the scheduled one-shot time
Indicates the one-shot operation and remains asserted for 30 seconds
afterwards
Indicates the one-shot operation is pending; that is, the present time is before
the scheduled one-shot time
N60 Network Stability and Synchrophasor Measurement System
5 SETTINGS
GE Multilin

Advertisement

Table of Contents
loading

Table of Contents