Grounding; Power Supply And Wiring - ABB CP410 Installation And Operation Manual

Table of Contents

Advertisement

Product Specifications
3.4

Grounding

To make sure that the operator terminal works properly and to prevent it from
radiating radio frequency noise, it must be connected to the earth ground.
3.5

Power Supply and Wiring

CP410 must use the power supply with 24 V DC and the power consumption
is 8 W.
Warning:
To avoid an electrical shock, be sure to switch off the power before connecting the
communication/download cable to the operator terminal.
Perform the following steps to wire the power connector:
1. Unplug the power connector and unscrew the screws.
2. Strip approximately 1 cm of insulation. Insert the wire all the way into the
power connector and then turn the screws tight.
3. Plug in the connector to the power outlet of the operator terminal.
Note:
The power connector is already plugged into the power outlet of operator termi-
nal when the package is first opened.
12
ABB, 1SBC159101M0201

Advertisement

Table of Contents
loading

Table of Contents