Unit Installation; Product Introduction - Bosch Climate 5000 Installation, Operation And Maintenance Manual

Modular air handling unit
Hide thumbs Also See for Climate 5000:
Table of Contents

Advertisement

8 | Unit installation

3 Unit installation
Find installation instruction
spare parts and accessories on place for storing
the documents and accessories. Before installa-
tion, transportation safety device with yellow
symbols shall be removed especially the safety
device for fan. Any abovementioned works must
be operated by professional personnel.
Unit body
Channel
Absorption gasket
Flat face foundation
Unit body
Channel
Absorption gasket
Concrete or steel-frame
strip foundation
Fig. 6 Schematic diagram of base installation
8736862495(2015/07)
, assembling
Flat face foundation
Concrete or steel support strap footing foundation

3.1 Product introduction

• To prevent vibration and noise transmission,
anti-vibration pads shall be applied between
equipment and foundation; foundation level-
ness should be 1/1000. After placement, the
tolerance of entire unit in height and width shall
be controlled within 3mm. For the details of
foundation installation→Fig. 6.
Climate 5000

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mahup(c)-32.40Mahup(c)-06.07

Table of Contents