Checklist

Check the mechanical and electrical installation of the drive before start-up. Go
through the checklist below together with another person. Read the
instructions
Check
MECHANICAL INSTALLATION
The ambient operating conditions are allowable. (See
Ratings,
Ambient
The unit is fastened properly to the cabinet. (See
Mechanical
installation.)
The cooling air will flow freely.
The motor and the driven equipment are ready for start. (See
installation, Technical
ELECTRICAL INSTALLATION (See
The VAR screw is removed if the drive is connected to an IT (ungrounded) supply network.
The capacitors are reformed if stored over one year (ask local ABB representative for more
information).
The drive is grounded properly.
The supply (input power) voltage matches the drive nominal input voltage.
The supply (input power) is connected to U1/V1/W1 (UDC+/UDC- in case of a DC supply)
and the terminals are tightened to specified torque.
Appropriate supply (input power) fuses and disconnector are installed.
The motor is connected to U2/V2/W2, and the terminals are tightened to specified torque.
The braking resistor (if present) is connected to R+/R-, and the terminals are tightened to
specified torque.
The motor cable (and braking resistor cable, if present) is routed away from other cables.
There are no power factor compensation capacitors in the motor cable.
The external control connections to the JCU Control Unit are OK.
There are no tools, foreign objects or dust from drilling inside the drive.
on the first pages of this manual before you work on the unit.
conditions.)
data:
Motor
connection.)
Planning the electrical installation, Electrical
Mechanical installation, Technical
Planning the cabinet assembly
Planning the electrical
63
Safety
data:
and
installation.)
Installation checklist

Advertisement

Table of Contents
loading

Table of Contents