Installation Checklist; What This Chapter Contains; Checklist - ABB ACS800-04 Hardware Manual

Drive modules
Hide thumbs Also See for ACS800-04:
Table of Contents

Advertisement

Installation checklist

What this chapter contains

This chapter contains the installation checklist.

Checklist

Check the mechanical and electrical installation of the drive before start-up. Go
through the checklist below together with another person. Read the
instructions
(page 11) in this manual before you do work on the unit.
Check
MECHANICAL INSTALLATION
The ambient operating conditions are allowed.
Ambient conditions
See
The unit is fixed properly on floor and a vertical non-flammable wall.
Mechanical installation
See
The cooling air flows freely.
ELECTRICAL INSTALLATION
Planning the electrical installation
See
The motor and the driven equipment are ready for start.
Motor selection and compatibility
See
The +E202 EMC filter capacitors are disconnected if the drive is connected to an IT
(ungrounded) system.
The capacitors are reformed if stored over one year (refer to
(3BFE64059629 [English]).
IEC data
(page 122),
(page 99) or
(page 33).
(page 37),
(page 38),
NEMA data
(page 114).
Electrical installation
(page 63).
Motor connection
(page 120).
Capacitor reforming instructions
Installation checklist 83
8
Safety

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs800-04mAcs800-u4

Table of Contents