Epson AN2WA87 Installation Instructions Manual page 14

All-in-one collaborative whiteboard an2 series 87" and 100"
Table of Contents

Advertisement

AN2 Series
Adding Whiteboard Brackets to Whiteboard
NOTE:
Use 3 whiteboard brackets (minimum of 2 brackets)
along bottom of whiteboard, and locate brackets as
close to outer corners as possible. Remaining brackets
may be used along sides of whiteboard, as desired.
1.
Install whiteboard brackets (MM) using:
Wood/steel studs/drywall: one #8 x 1-1/2" screw (LL)
into back of each whiteboard bracket.
Concrete wall: one #8 x 1-1/2" screw (LL) into back of
each whiteboard bracket, and into installed AF6 toggler
(KK).
2.
Fasten to whiteboard frame using one #8 x 1/2" self-drilling
screw (JJ) per whiteboard bracket (MM).
(LL)
1
Figure 20
Attaching Valence
1.
Align right valence bracket (D) along outside of right brace
on back of valence (E), and fasten with two 10-24 x 1/4"
Phillips pan head machine screws (L). (See Figure 21)
2.
Align left valence bracket (C) along outside of left brace on
back of valence (E), and fasten with two 10-24 x 1/4" Phillips
pan head machine screws (L). (See Figure 21)
3.
Slide the valence (E) with attached brackets into the boom
projector mount (S), sliding brackets under tabs in boom
and adjust distance as required. (See Figure 22)
4.
Fasten through bracket slots into boom mount using four
10-24 x 1/4" Phillips pan head machine screws (L). (See
Figure 22)
14
(MM)
2
(JJ)
(C)
2
Left brace
1
(L) x 4
2
Figure 21
4
(E)
Tabs
3
Figure 22
5.
Readjust projector following instructions in the Align
Projector Image section.
Installation Instructions
(D)
(E)
1
Bracket
placed on
outside edge
of brace
Right brace
(L) x 4

Advertisement

Table of Contents
loading

Table of Contents