Epson AN2WA87 Installation Instructions Manual page 16

All-in-one collaborative whiteboard an2 series 87" and 100"
Table of Contents

Advertisement

AN2 Series
FASTENER INSTALLATION METHODS
NOTE:
Refer to Table 1 for appropriate hardware and pilot hole
sizes for various wall types.
Steel Stud / Drywall
1.
Hold metal channel on anchor (H) flat alongside plastic
straps and slide channel through hole. (See Figure 27)
Drywall
Plastic straps
(H)
Figure 27
2.
Holding plastic straps on anchor (H), pull anchor away from
wall until channel rests flush behind wall making sure anchor
channel is positioned vertically on drywall, or steel stud (if
present). (See Figure 28)
3.
Slide plastic cap on anchor (H) towards wall until flange of
cap is flush with wall. (See Figure 28)
Steel stud
(if present)
Drywall
Plastic cap
(H)
Anchor metal channel
(side view)
Figure 28
4.
Snap off plastic straps on anchor at wall by pushing side to
side, snapping off straps level with flange of plastic cap.
(See Figure 29)
16
1
2
3
Steel stud
(if present)
4
Drywall
Plastic cap
Plastic straps
Anchor metal channel
(side view)
Figure 29
5.
Line up anchor with attachment point.
6.
Insert 1/4-20 x 1-3/4" Phillips pan head screw (F) through
1/4" washer (G), corresponding mounting hole in product
and into anchor (H), and tighten until flush against product.
DO NOT over tighten! (See Figure 30)
Steel stud
(if present)
Drywall
(G) x 4
(F) x 4
6
Product
Anchor metal channel
(side view)
Figure 30
Installation Instructions

Advertisement

Table of Contents
loading

Table of Contents