Installation - Epson AN2WA87 Installation Instructions Manual

All-in-one collaborative whiteboard an2 series 87" and 100"
Table of Contents

Advertisement

AN2 Series

INSTALLATION

Determining Location
1
HEIGHT FROM FLOOR
1.
Determine desired height of whiteboard (measured from
floor). (See Figure 1)
2.
Determine desired center of whiteboard. (See Figure 1)
3.
Measure 10-5/8 inches (270mm) up from desired height
(top) of whiteboard and 2-3/4 inches (69mm) to the right
of center of whiteboard and mark location. (See Figure 1)
NOTE:
This pilot hole may be placed in drywall only, if
necessary.
4.
Determine location of studs behind drywall.
5.
Drill one pilot hole (see Table 1 for size) at location marked
in Step 3 (See Figure 1) and follow fastener information
(appropriate for wall type) located in Table 1.
IMPORTANT ! : See Fastener Installation Methods at
end of Installation Instructions for details on installing
product into various wall types.
6
10 5/8"
2
[270mm]
2 3/4"
[70mm]
2
Figure 1
Table 1: Fastener Information
WALL TYPE
PILOT
HOLE
Drywall only-
(boom attach
only) /
Steel studs
Wood stud
Concrete
8mm x 80mm
(Only for
installing
whiteboard
bracket into
concrete)
6mm x 45mm
Installation Instructions
5
3
FLOOR
FASTENERS (see
PARTS drawing)
1/2"
1/4-20 Toggler anchor kit (F,
G, H)
- 1/4-20 x 1-3/4" Phillips
screw (F)
- 1/4" washer (G)
- 1/4-20 Snap toggler (H)
1/8"
1/4 x 2-1/2" hex head lag (J)
1/4" washer (G) - OPTIONAL
1/4 x 2-1/2" hex head lag (J)
Hilti Hud-L #8x60 anchor (K)
#8-9x1-1/2" Phillips screw (Z)
Toggler AF6 (BB) or (KK)

Advertisement

Table of Contents
loading

Table of Contents