HP 5890 SERIES II Service Manual page 156

Gas chromatograph
Hide thumbs Also See for 5890 SERIES II:
Table of Contents

Advertisement

4. Connect a voltmeter between ground (TP1 on
the detector PCB or the aluminum oven top)
and the HV reference test point (TP7).
5. Set the voltage at an optimum point. This point
should be somewhere between - 750 and
- 850 V dc. Voltage setting should never ex-
ceed - 950 V dc.
6. Perform a verification analysis.
Reset the voltage and perform another
analysis. Continue this sequence
until the maximum sensitivity is
attained (greatest area counts
for a given amount of sample
injected, divided by noise).
7. Install the right side panel and secure using four screws.
8. Install the electronics carrier top cover.
Artisan Scientific - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisan-scientific.com
SIGNAL CABLE
HIGH
VOLTAGE
CABLE
SVC 4- 86
HIGH VOLTAGE
ADJUSTMENT
HIGH VOLTAGE
REFERENCE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents