Connecting Calmaster2 To A Computer - ABB CalMaster2 Instruction Manual

Tests the integrity of a flow metering system by altering a number of flow measurement parameters and measuring the values returned from the flow measuring system.
Hide thumbs Also See for CalMaster2:
Table of Contents

Advertisement

Field and Software Tools
CalMaster2 and CheckMaster
11. After each test a status screen appears:
P=12 M=0 F=0
This displays a count of the number of tests that have passed, are marginal or have failed. It
can also be used as a progress indicator as there are between 24 and 26 tests (depending
on the selection made).
12. Once all the tests are complete, the initialization screen appears. Disconnect the flow
metering system and either connect a new system (start the process again from step 3) and
press 'Ok' or wait two minutes for the CalMaster2 to shut down automatically.

4.2 Connecting CalMaster2 to a Computer

Caution.
If there is insufficient battery charge to completely a download there is a chance that the
CalMaster2 will shutdown automatically before a download is complete. If this happens
the test is corrupted and lost. Recharge the CalMaster2 – see Section 6, page 40 and
reset the CalMaster2 – see Section 5.4.1, page 28.
CalMaster2 switches off automatically after two minutes unless it is downloading
verifications. To switch on, disconnect the mains adaptor, press the 'On' button and then
reconnect the mains adaptor.
Connect the CalMaster2 to the computer using the RS232 cable provided – see Fig. 4.1. It is
recommended that the CalMaster2 is connected to the power supply while downloading – see
Section 6, page 40.
Fig. 4.1 Connecting the CalMaster2 to a Computer
To connect CalMaster2 to a computer:
Slide the cover A down to reveal the serial port.
1.
Connect the RS232 cable to the CalMaster2 B.
2.
Connect the RS232 cable to the computer C
3.
22
C
A
B
IM/VCM2 Issue 6
4 Testing

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Checkmaster

Table of Contents