Mitsubishi Electric 700 Series Installation Manualline page 6

Hide thumbs Also See for 700 Series:
Table of Contents

Advertisement

INSTALLATION
1.3 General Precaution
The bus capacitor discharge time is 10 minutes. Before starting wiring or inspection, switch power off, wait for more than
10 minutes, and check for residual voltage between terminal P/+ and N/
shock.
1.4 Environment
Before installation, check that the environment meets following specifications.
Ambient temperature
Ambient humidity
Storage temperature
Ambience
Altitude, vibration
2.9m/s² or less for the 04320 or more.
CAUTION
Install the inverter on a strong surface securely and vertically with bolts.
Leave enough clearances and take cooling measures.
Avoid places where the inverter is subjected to direct sunlight, high temperature and high humidity.
Install the inverter on a non-combustible surface.
2
-10°C to +50°C (non-freezing) for selected overload
capability 150 %, 200 % (initial setting) or 250 %
-10°C to +40°C (non-freezing) for selected overload
capability 120 %
90% RH or less (non-condensing)
20°C to +65°C
Indoors (No corrosive and flammable gases, oil mist, dust and dirt)
2
Below 1000m, 5.9m/s
or less
with a meter etc., to avoid a hazard of electrical
5 cm
Measurement
position
Measurement
position
Inverter
5 cm
5 cm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents