Download Print this page

Pioneer SGY-PM910H2 Installation Manual page 27

Pedaling monitor sensor
Hide thumbs Also See for SGY-PM910H2:

Advertisement

Before Pairing and Calibrating
Pairing and Calibrating Procedure
1.
Anchoring the bicycle and installing the crank (page
2.
Switching the modes of the Cyclocomputer SGX-CA500 (page
3.
Pairing the pedaling monitor sensor (page
4.
Calibrating a highly precise zero point (page
5.
Setting the crank length and calibrating weight (page
6.
Calibrating the with a load on the pedals (page
7.
Checking the calibration (page
Anchoring the Bicycle and Installing the Crank
27
)
)
)
)
3
)
)
)

Advertisement

loading

This manual is also suitable for:

Sgy-pm910hrSgy-pm910hl