Cycle Time Extension As A Result Of Testing And Commissioning Functions; Cycle Extension Through Component Based Automation (Cba) - Siemens CPU 31 Series Technical Data Manual

Table of Contents

Advertisement

Cycle and reaction times
5.2 Cycle time
Tips
• Use the default setting wherever possible.
• Increase this value only if the CPU is used primarily for communications and if the user
• In all other situations you should only reduce this value.
5.2.5

Cycle time extension as a result of testing and commissioning functions

Runtimes
The runtimes of the testing and commissioning functions are operating system runtimes, so
they are the same for every CPU. Initially, there is no difference between process mode and
testing mode. How the cycle time is extended as a result of active testing and commissioning
functions is shown in the table below.
Table 5-9
Function
Status variable
Control variable
Block status
Configuration during parameter assignment
For process operation, the maximum permissible cycle load by communication is not
specified in "Cycle load by communication", but rather in "Maximum permitted increase of
cycle time as a result of testing functions during process operation". Thus, the configured
time is monitored absolutely in process mode and data acquisition is stopped if a timeout
occurs. This is how STEP 7 stops data requests in loops before a loop ends, for example.
When running in Testing mode, the complete loop is executed in every cycle. This can
significantly increase cycle time.
5.2.6

Cycle extension through Component Based Automation (CBA)

By default, the operating system of your CPU updates the PROFINET interface as well as
the DP interconnections at the cycle control point. However, if you deactivated these
automatic updates during configuration (e.g. to obtain improved capabilities of influencing the
time behavior of the CPU), you must perform the update manually. This is done by calling
SFCs 112 to 114 at the appropriate times.
Reference
Information about SFC 112 to 114 is available in the
5-10
program is not time critical.
Cycle time extension as a result of testing and commissioning functions
CPU 31xC/ CPU 31x
50 μs for each variable
50 μs for each variable
200 μs for each monitored line
STEP 7 Online Help
Manual, 01/2006 Edition, A5E00105475-06
.
CPU 31xC and CPU 31x, Technical Data