Toro RT600 Operator's Manual page 11

Direct drive trencher
Hide thumbs Also See for RT600:
Table of Contents

Advertisement

Installing the Boom-Roller Assembly
1x
1. Add grease to the washers and ensure that the washers are flush with the roller surface when installing.
2. Install the boom pin through the boom-roller assembly being careful to center the cone spacers before sliding the
pin through.
3. Apply thread-locking adhesive to the bolt and torque to 230 to 258 N∙m (170 to 190 ft-lb).
4. After the assembly is installed, apply grease to the boom end roller slowly while rotating the roller until the grease
is purged from the roller.
Installing the Shield Extension (Long Boom Only)
Apply thread-locking adhesive to the bolts (M10) and secure the shield extension onto the boom assembly.
2x
1x
1x
1x
11
1x
1x
(3/4 x 1-1/2
inches)
8x
(M10)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2520025200e

Table of Contents