61
INSTALLATION
1) Installation space.
30 (1-3/16)
or more
2) Processing of the remote controller cable.
55 (2-5/32)
45 (1-25/32)
30 (1-3/16)
8 (5/16)
8 (5/16)
8
(5/16)
For UTY-RVNYN
●
Fix the near end of the Tube with the cable tie (large) firmly.
Do not fix the functional earthing wire with the cable tie (large).
●
Connect the functional earthing wire of remote controller and the remote controller cable,
and perform the insulation.
3) Insert the flat-blade screwdriver and remove the front case and rear case by twisting it slightly.
Unit : mm (in.)
* Please secure enough space
30 (1-3/16)
where a flat screwdriver to take off
or more
a case can be inserted.
30 (1-3/16)
or more
220 (8-21/32) or
more*
Unit : mm (in.)
1. 12V (Red)
2. Signal (White)
3. COM (Black)
- (OP005 - 09) -