Prepare the site and unpack the system

Before you begin
Verify that you have the following components:
2U DP4400 system
l
Rail kit, including:
l
Two sliding rails
n
Two velcro straps
n
Four screws
n
Four washers
n
Two power cables
l
Bezel
l
Phillips-head screwdriver with magnetic tip (not provided)
l
Qualified Ethernet cables:
l
Type of switch
10Gb SFP+
1Gb or 10Gb RJ45
1Gb or 10Gb RJ45
Anti-static wrist strap and conductive foam pad
l
You must have a computer at the install location with:
A power adapter, C13 to NEMA 5–15 (if based in North America or country
l
specific cord in other geographical locations), or a power cord for your laptop
power adapter with a C13 plug, to power your laptop from a rack PDU
An Ethernet port
l
Latest version of Google Chrome or Mozilla Firefox
l
Note
Ensure that ICMP (ping) is enabled in the customer environment during IDPA
installation.
The following steps must be completed before starting initial configuration with the
Appliance Configuration Manager:
Procedure
1. Identify 13 unassigned IP addresses for the IDPA components. To simplify
configuration, select a range of 13 contiguous addresses.
NIC Type
Speed
SFP+ (optical)
10Gb
SFP+ with 1GbBASE-
1Gb
T GBIC
10GbBASE-T (RJ45)
1Gb or 10Gb
(depending on the
switch)
Prepare the site and unpack the system
Cable Required
LC-to-LC with SR
optical GBICs or
twinax
UTP with RJ45
(Cat5e or Cat6)
UTP/STP with RJ45
(Cat6a or Cat7)
3