Benchmark Checklist - Panasonic Aquarea Tank Duo GH 200 Design, Installation & Servicing Instructions

Unvented cylinders specifically designed to work with a heat pump
Table of Contents

Advertisement

demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission this equipment to the manufacturer's instructions may invalidate the warranty but does not affect statutory rights.
MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST
Customer name:
Address:
This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of
Cylinder Make and Model
demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Cylinder Serial Number
Failure to install and commission this equipment to the manufacturer's instructions may invalidate the warranty but does not affect statutory rights.
Commissioned by (PRINT NAME):
Company name:
Company address:
Customer name:
Address:
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*:
Cylinder Make and Model
Building Regulations Notification Number (if applicable)
Cylinder Serial Number
ALL SYSTEMS PRIMARY SETTINGS (indirect heating only)
Commissioned by (PRINT NAME):
Is the primary circuit a sealed or open vented system?
Company name:
What is the maximum primary flow temperature?
Company address:
ALL SYSTEMS
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*:
What is the incoming static cold water pressure at the inlet to the system?
Building Regulations Notification Number (if applicable)
Has a strainer been cleaned of installation debris (if fitted)?
Is the installation in a hard water area (above 200ppm)?
ALL SYSTEMS PRIMARY SETTINGS (indirect heating only)
If yes, has a water scale reducer been fitted?
Is the primary circuit a sealed or open vented system?
What type of scale reducer has been fitted?
What is the maximum primary flow temperature?
What is the hot water thermostat set temperature?
ALL SYSTEMS
What is the maximum hot water flow rate at set thermostat temperature (measured at high flow outlet)?
What is the incoming static cold water pressure at the inlet to the system?
Time and temperature controls have been fitted in compliance with Part L of the Building Regulations?
Has a strainer been cleaned of installation debris (if fitted)?
Type of control system (if applicable)
Is the installation in a hard water area (above 200ppm)?
Is the cylinder solar (or other renewable) compatible?
If yes, has a water scale reducer been fitted?
What is the hot water temperature at the nearest outlet?
What type of scale reducer has been fitted?
All appropriate pipes have been insulated up to 1 metre or the point where they become concealed
What is the hot water thermostat set temperature?
UNVENTED SYSTEMS ONLY
What is the maximum hot water flow rate at set thermostat temperature (measured at high flow outlet)?
Where is the pressure reducing valve situated (if fitted)?
Time and temperature controls have been fitted in compliance with Part L of the Building Regulations?
What is the pressure reducing valve setting?
Type of control system (if applicable)
Has a combined temperature and pressure relief valve and expansion valve been fitted and discharge tested?
Is the cylinder solar (or other renewable) compatible?
The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations
What is the hot water temperature at the nearest outlet?
Are all energy sources fitted with a cut out device?
All appropriate pipes have been insulated up to 1 metre or the point where they become concealed
Has the expansion vessel or internal air space been checked?
UNVENTED SYSTEMS ONLY
THERMAL STORES ONLY
Where is the pressure reducing valve situated (if fitted)?
What store temperature is achievable?
What is the pressure reducing valve setting?
What is the maximum hot water temperature?
Has a combined temperature and pressure relief valve and expansion valve been fitted and discharge tested?
The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations
ALL INSTALLATIONS
Are all energy sources fitted with a cut out device?
The hot water system complies with the appropriate Building Regulations
Has the expansion vessel or internal air space been checked?
The system has been installed and commissioned in accordance with the manufacturer's instructions
The system controls have been demonstrated to and understood by the customer
THERMAL STORES ONLY
The manufacturer's literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
What store temperature is achievable?
What is the maximum hot water temperature?
Commissioning Engineer's Signature
Customer's Signature
ALL INSTALLATIONS
(To confirm satisfactory demonstration and receipt of manufacturer's literature)
The hot water system complies with the appropriate Building Regulations
The system has been installed and commissioned in accordance with the manufacturer's instructions
The system controls have been demonstrated to and understood by the customer
The manufacturer's literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Commissioning Engineer's Signature
Customer's Signature
(To confirm satisfactory demonstration and receipt of manufacturer's literature)
* All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer.
© Heating and Hotwater Industry Council (HHIC)
While this Checklist can be used for any installation covered by its description, only appliances manufactured by Scheme Members will
be covered by the rules and requirements of the Benchmark Scheme.
* All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer.
BENCHMARK
© Heating and Hotwater Industry Council (HHIC)
Telephone number:
Registered Operative ID Number
Telephone number:
Telephone number:
Commissioning date:
Registered Operative ID Number
Sealed
Telephone number:
Commissioning date:
Sealed
Y Plan
Y Plan
Page 26
Open
°C
bar
Yes
No
Yes
No
Yes
No
Open
°C
°C
I/min
bar
Yes
Yes
No
S Plan
Other
Yes
No
Yes
No
Yes
No
°C
Yes
°C
I/min
Yes
bar
S Plan
Other
Yes
No
Yes
No
Yes
°C
Yes
No
Yes
Yes
No
°C
bar
°C
Yes
No
Yes
Yes
No
Yes
Yes
No
Yes
Yes
Yes
°C
°C
Yes
Yes
Yes
Yes
www.centralheating.co.uk
www.centralheating.co.uk

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aquarea tank duo gh 300Aquarea tank duo gh 200 pre-plumbedAquarea tank duo gh 300 pre-plumbed

Table of Contents