Positioning; Preparing For Installation - LG HJ747DAP Owner's Manual

Table of Contents

Advertisement

Positioning

This appliance is to be built into a kitchen unit
or worktop, providing the following minimum
distances are allowed ;
510 mm
740 mm
CLEARANCES REQUIRED WHEN FITTING THE
GAS HOB WITH A HOOD ABOVE
60 mm
400 mm
Min.
200 mm
Min.
• 400 mm between the top plate surfaces, providing
that the underside of the horizontal surface is in line
with the outer edge of the top plate. If the underside
of the horizontal surface is lower than 400 mm,
then it must be at least 50 mm away from the outer
edges of the top plate.
• 50 mm clearance around the appliance and
between the top plate surface and any combustible
materials.
• If the surface is narrow, install the heatproof plate
on the right, left and back.
− If oven is used, must have forced ventilation to
install gas hob above it.
− Check the dimensions of the oven in the
installation manual.
− The cut out size must obey the indication.
760 mm
475 mm
700 mm
Min.
400 mm
Back Wall
25 mm (MIN.)
Ø100 mm Hole for Gas
Pipe and Power Cord
Recommended
Hole location
(Ø100 mm)
475 mm
740 mm
Front
NOTE
The gas line and power cord must not be passed
near the top plate to prevent fire hazard.

Preparing for Installation

Tools You Will Need(Not provided)
Phillips screwdriver
Flat-blade screw driver
INSTALLATION
11
Front
50 mm
70 mm
50 mm
Top View
of Platform
Open-end or
adjustable wrench
7 mm Nut Driver

Advertisement

Table of Contents
loading

Table of Contents